Building construction wages: Oswego, New York
Wage determination NY20260027 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NY20260027 on · latest revision 2 · verify at sam.gov/wage-determination/NY20260027/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-30 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (DUCT, PIPE, & MECHANICAL SYSTEM INSULATION) | $43.25 | $27.29 | $70.54 |
| TILE SETTER | $31.81 | $17.50 | $49.31 |
| BRICKLAYER (INCLUDES POINTING, CAULKING, AND CLEANING) | $34.15 | $19.71 | $53.86 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $32.59 | $23.24 | $55.83 |
| MILLWRIGHT | $30.20 | $23.83 | $54.03 |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS, HVAC/TEMPERATURE CONTROLS AND SOUND AND COMMUNICATION SYSTEMS) | $50.50 | $35.03 | $85.53 |
| POWER EQUIPMENT OPERATOR: CRANE | $49.61 | $31.85 | $81.46 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $48.11 | $31.85 | $79.96 |
| IRONWORKER: ORNAMENTAL AND REINFORCING | $37.16 | $30.68 | $67.84 |
| LABORER: COMMON OR GENERAL | $29.88 | $22.90 | $52.78 |
| PAINTER: BRUSH AND ROLLER | $23.25 | $21.21 | $44.46 |
| DRYWALL FINISHER/TAPER | $23.25 | $21.21 | $44.46 |
| PAINTER (SPRAY) | $24.39 | $21.61 | $46.00 |
| GLAZIER | $30.00 | $27.59 | $57.59 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | $31.43 | $23.61 | $55.04 |
| PLUMBER | $35.51 | $24.57 | $60.08 |
| ROOFER | $35.80 | $25.99 | $61.79 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $45.06 | $30.71 | $75.77 |
| SHEET METAL WORKER (INCLUDING INSTALLATION OF HVAC DUCT, METAL FLASHING, AND SIDING (ALUMINUM, METAL, VINYL)) | $36.29 | $23.31 | $59.60 |
| OPERATOR: ROLLER | $28.51 | $12.31 | $40.82 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.19 | $17.42 | $47.61 |
| OPERATOR: FORKLIFT | $33.14 | $21.04 | $54.18 |
| OPERATOR: BULLDOZER | $31.03 | $20.05 | $51.08 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $36.17 | $17.76 | $53.93 |
| LABORER: PIPELAYER | $20.47 | $0.00 | $20.47 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $20.89 | $10.46 | $31.35 |
| LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS) | $29.18 | $17.72 | $46.90 |
| IRONWORKER, STRUCTURAL | $26.37 | $9.91 | $36.28 |
| CEMENT MASON/CONCRETE FINISHER | $33.12 | $16.84 | $49.96 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $23.95 | $21.45 | $45.40 |