Building construction wages: Jefferson, New York

Wage determination NY20260022 · Active · Standard · verify on SAM.gov

Jefferson

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 22026-05-18diff vs rev 1
rev 12026-05-17diff vs rev 0
rev 02026-01-30original

Current rates (rev 2)

Download CSV
ClassificationRateFringeTotal
ASBESTOS WORKER/HEAT & FROST INSULATOR (DUCT, PIPE, & MECHANICAL SYSTEM INSULATION)$43.25$27.29$70.54
BRICKLAYER (INCLUDES POINTING, CAULKING, AND CLEANING)$33.45$20.14$53.59
TILE SETTER$31.81$17.50$49.31
MILLWRIGHT$30.20$23.83$54.03
ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS, HVAC/TEMPERATURE CONTROLS AND SOUND AND COMMUNICATION SYSTEMS)$43.50$28.38$71.88
POWER EQUIPMENT OPERATOR: CRANE$49.61$31.85$81.46
LABORER: MASON TENDER - BRICK$27.03$25.45$52.48
LABORER: COMMON OR GENERAL$27.03$25.45$52.48
LABORER (MASON TENDER - CEMENT/CONCRETE)$27.03$25.45$52.48
PAINTER (SPRAY)$29.90$25.36$55.26
DRYWALL FINISHER/TAPER$30.90$25.36$56.26
PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION)$31.43$23.61$55.04
ROOFER$35.80$25.99$61.79
SPRINKLER FITTER (FIRE SPRINKLERS)$45.06$30.71$75.77
SHEET METAL WORKER, INCLUDING INSTALLATION OF HVAC DUCT, METAL FLASHING, AND SIDING (ALUMINUM, METAL, VINYL)$28.11$17.75$45.86
PLUMBER, INCLUDES HVAC PIPE INSTALLATION$33.72$16.03$49.75
PAINTER (BRUSH AND ROLLER)$22.32$13.95$36.27
OPERATOR: ROLLER$27.74$5.89$33.63
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$30.19$17.42$47.61
OPERATOR: FORKLIFT$33.14$21.04$54.18
OPERATOR: BULLDOZER$31.60$21.52$53.12
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$36.17$17.76$53.93
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$33.62$17.98$51.60
LABORER: PIPELAYER$20.47$0.00$20.47
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR$20.89$10.46$31.35
LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS)$29.18$17.72$46.90
IRONWORKER, STRUCTURAL$29.41$21.63$51.04
IRONWORKER, REINFORCING$28.00$21.43$49.43
IRONWORKER, ORNAMENTAL$28.70$22.02$50.72
GLAZIER$29.52$11.47$40.99
CEMENT MASON/CONCRETE FINISHER$30.61$5.82$36.43
CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION$25.70$15.85$41.55