Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| HAZARDOUS MATERIAL HANDLER | $34.15 | $26.09 | $60.24 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR (INCLUDE APPLICATION OF ALL MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS) | $37.65 | $30.69 | $68.34 |
| HAZARDOUS MATERIAL HANDLER | $34.15 | $26.09 | $60.24 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR (INCLUDE APPLICATION OF ALL MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS) | $37.65 | $30.69 | $68.34 |
| POINTER, CLEANER AND CAULKER | $36.82 | $31.33 | $68.15 |
| MARBLE MASON | $36.85 | $30.80 | $67.65 |
| TILE, MARBLE & TERRAZZO FINISHER | $34.71 | $17.54 | $52.25 |
| TILE & TERRAZZO WORKER | $37.85 | $31.80 | $69.65 |
| BRICKLAYER, STONEMASON | $37.44 | $32.71 | $70.15 |
| POINTER, CLEANER AND CAULKER | $36.82 | $31.33 | $68.15 |
| MARBLE MASON | $36.85 | $30.80 | $67.65 |
| TILE, MARBLE & TERRAZZO FINISHER | $34.71 | $17.54 | $52.25 |
| TILE & TERRAZZO WORKER | $37.85 | $31.80 | $69.65 |
| BRICKLAYER, STONEMASON | $37.44 | $32.71 | $70.15 |
| CARPENTERS (INCLUDING DRYWALL HANGING & ACOUSTICAL CEILING INSTALLATION) (CARPENTERS AND SOFT FLOOR LAYERS) | $34.26 | $25.94 | $60.20 |
| ELECTRICIANS | $44.20 | $32.90 | $77.10 |
| ELEVATOR MECHANIC | $62.39 | $38.44 | $100.83 |
| POWER EQUIPMENT OPERATOR: GROUP A1 ROLLER | $44.23 | $35.40 | $79.63 |
| POWER EQUIPMENT OPERATOR: GROUP A1 LOADER | $44.23 | $35.40 | $79.63 |
| POWER EQUIPMENT OPERATOR: GROUP A1 BULLDOZER | $44.23 | $35.40 | $79.63 |
| POWER EQUIPMENT OPERATOR: GROUP A1 FORKLIFT OPERATOR/LULL | $44.23 | $35.40 | $79.63 |
| POWER EQUIPMENT OPERATOR: GROUP A1 BACKHOE OPERATORS | $44.23 | $35.40 | $79.63 |
| IRONWORKERS: (SHEETER) | $36.25 | $33.12 | $69.37 |
| IRONWORKER | $36.25 | $33.12 | $69.37 |
| LABORERS: GROUP 9 USE OF SUPPLIED AIR RESPIRATORS | $37.45 | $41.36 | $78.81 |
| LABORERS: GROUP 8 THE HANDLING, LOADING, UNLOADING, STACKING, DISTRIBUTION, ERECTION AND DISMANTLING OF ANY AND ALL TYPES OF SCAFFOLDING AND/OR WORK PLATFORMS USED IN THE REMOVAL OF INSULATING MATERIAL REGARDLESS OF THE COMPOSITION OF SAID MATERIAL. THE REMOVAL OF ALL INSULATION MATERIALS WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEMS, (PIPES, BOILERS,DUCTS, FLUES, BREECHINGS, ETC.) ON ALL MECHANICAL SYSTEMS (PIPES, BOILERS, DUCTS, FLUES, BREECHING, ETC.) THAT ARE GOING TO BE SCRAPPED. THE REMOVAL OF ALL INSULATING MATERIALS WHETHER THEY CONTAIN ASBESTOS OR NOT. THE REMOVAL OF ALL ASBESTOS CONTAINING MATERIALS FROM WALLS, CEILINGS, FLOORS, COLUMNS AND ALL OTHER NON-MECHANICAL STRUCTURES AND SURFACES, ETC; | $34.45 | $41.36 | $75.81 |
| LABORERS: GROUP 7 POTMAN, PIPELAYERS, PAVEMENT BREAKERS OR BUSTERS, JACKHAMMER OPERATORS; BARCO RAMMERS; CHAIN SAW; POWDER MONKEY; BLACK TOP RAKERS; SCALERS; DRILL TENDERS; MORTAR MIXERS; CONCRETE POLISHING MACHINE; OPERATION & MAINTENANCE OF ALL ROBOTIC REMOTE SYSTEMS IN HAZARDOUS ENVIRONMENT; PERATION C MEN WORKING FROM SWINGING SCAFFOLD BOSUM CHAIR; SUSPENDED CAGE OR BUCKET; WORK IN CAISSONS BELOW 8 FEET; CONCRETE MOTOR BUGGY; ALL OTHER OPERATORS OF MECHANICAL TOOLS, INCLUDING VIBRATORS EGARDLESS OF TYPE OF POWER. | $32.75 | $41.36 | $74.11 |
| LABORERS: GROUP 6 VIDEO MACHINE OPERATOR IN INSPECTION OF PIPE | $32.95 | $41.36 | $74.31 |
| LABORERS: GROUP 5 ROAD FINISHER, FORM SETTER, GUNNITE NOZZLEMAN, SANDBLASTERS, BURNING TORCH, CONCRETE SAW OPERATORS, GROUT MACHINE AND GROUT PUMPS OPERATOR | $33.05 | $41.36 | $74.41 |
| LABORERS: GROUP 4 LASER BEAM OPERATOR | $33.30 | $41.36 | $74.66 |
| LABORERS: GROUP 3 WAGON DRILL-AIRTRACK, SELF-CONTAINED DRILL | $33.45 | $41.36 | $74.81 |
| LABORERS: GROUP 2 BLASTERS, GRADE CHECKER; 10% OF BASE RATE | $35.70 | $41.36 | $77.06 |
| LABORERS: GROUP 1 COMMON LABORERS, DECONTAMINATION OF ALL MACHINES; HORIZONTAL DIRECTIONAL DRILL/LOCATOR; ALL TERRAIN VEHICLES WITH ATTACHMENTS/ALL WHEEL OR TRACK TYPES | $32.45 | $41.36 | $73.81 |
| PAINTERS: DRYWALL/TAPING (TOWNSHIPS OF HARTLAND, LOCKPORT NORTH TONAWANDA, NEWFANE, PENDLETON, ROYALTON, SOMERSET AND THE EASTERN HALVES OF CAMBRIA AND WILSON) | $34.00 | $28.51 | $62.51 |
| PAINTERS: BRUSH & ROLLER (TOWNSHIPS OF HARTLAND, LOCKPORT NORTH TONAWANDA, NEWFANE, PENDLETON, ROYALTON, SOMERSET AND THE EASTERN HALVES OF CAMBRIA AND WILSON) | $33.00 | $28.21 | $61.21 |
| PAINTERS: TAPERS/DRY WALL (TOWNSHIPS OF LEWISTON, NIAGARA FALLS, PORTER, WHEATFIELD AND THE WESTERN HALVES OF CAMBRIA AND WILSON) | $34.00 | $28.51 | $62.51 |
| PAINTERS: PAINTERS (TOWNSHIPS OF LEWISTON, NIAGARA FALLS, PORTER, WHEATFIELD AND THE WESTERN HALVES OF CAMBRIA AND WILSON) | $33.00 | $28.21 | $61.21 |
| GLAZIER | $34.68 | $27.64 | $62.32 |
| PLASTERER | $30.15 | $20.49 | $50.64 |
| CEMENT FINISHER | $33.55 | $34.17 | $67.72 |
| PLASTERER | $30.15 | $20.49 | $50.64 |
| CEMENT FINISHER | $33.55 | $34.17 | $67.72 |
| PLUMBER AND STEAMFITTER (ZONE 1) | $42.20 | $29.80 | $72.00 |
| ROOFERS: SLATE & TILE | $35.11 | $26.03 | $61.14 |
| ROOFERS: COMPOSITION | $34.96 | $26.03 | $60.99 |
| SHEET METAL WORKER | $39.50 | $29.18 | $68.68 |