Building, Heavy, Highway, Residential construction wages: Nassau, Suffolk, New York
Wage determination NY20260012 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NY20260012 on · latest revision 2 · verify at sam.gov/wage-determination/NY20260012/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-30 | original |
Current rates (rev 2)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| HAZARDOUS MATERIAL HANDLER | $47.75 | $13.70 | $61.45 |
| ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) | $71.76 | $36.81 | $108.57 |
| HAZARDOUS MATERIAL HANDLER | $47.75 | $13.70 | $61.45 |
| ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) | $71.76 | $36.81 | $108.57 |
| BOILERMAKER | $68.88 | $49.83 | $118.71 |
| MASON - STONE | $69.91 | $44.02 | $113.93 |
| BRICKLAYER | $67.39 | $35.90 | $103.29 |
| MASON - STONE | $69.91 | $44.02 | $113.93 |
| BRICKLAYER | $67.39 | $35.90 | $103.29 |
| CARPENTERS: NASSAU COUNTY (REMAINDER OF COUNTY) AND SUFFOLK COUNTY (BUILDING) | $53.56 | $34.28 | $87.84 |
| CARPENTERS: (RESIDENTIAL) | $34.14 | $23.15 | $57.29 |
| CARPENTERS: (HEAVY & HIGHWAY) | $53.56 | $34.28 | $87.84 |
| MILLWRIGHT | $60.83 | $58.03 | $118.86 |
| CARPENTERS: DIVERS | $75.46 | $55.84 | $131.30 |
| CARPENTERS: (PILEDRIVERMAN) | $60.59 | $55.84 | $116.43 |
| CARPENTERS: (DOCKBUILDERS) | $60.59 | $55.84 | $116.43 |
| CARPENTERS: (DIVERS TENDERS) | $55.00 | $55.84 | $110.84 |
| CARPENTERS: (TIMBERMEN) | $55.59 | $55.41 | $111.00 |
| CARPENTER (SOFT FLOOR LAYERS) | $59.05 | $48.08 | $107.13 |
| ELECTRICIAN | $64.55 | $47.40 | $111.95 |
| ELECTRICIANS: (TELEPHONE UNIT) | $42.93 | $32.43 | $75.36 |
| ELECTRICIANS: (MAINTENANCE UNIT) | $49.79 | $32.27 | $82.06 |
| LINE CONSTRUCTION: MATERIAL MAN (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/ TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT;) | $61.40 | $36.24 | $97.64 |
| LINE CONSTRUCTION: LINEMAN & CABLE SPLICER (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/ TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT;) | $70.57 | $39.19 | $109.76 |
| LINE CONSTRUCTION: HEAVY EQUIPMENT OPERATOR (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/ TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT;) | $56.46 | $34.63 | $91.09 |
| LINE CONSTRUCTION: GROUNDMAN (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/ TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT;) | $42.34 | $30.05 | $72.39 |
| ELEVATOR MECHANIC (MODERNIZATION AND REPAIR) | $59.09 | $45.56 | $104.65 |
| ELEVATOR MECHANIC (ELEVATOR CONSTRUCTOR) | $75.14 | $47.45 | $122.59 |
| POWER EQUIPMENT OPERATORS: GROUP 5 (BUILDING CONSTRUCTION) BATCHING PLANT (ON SITE OF JOB), GENERATOR (SMALL), MIXER (WITH SKIP), MIXER (2 SMALL WITH OR WITHOUT SKIP), MIXER (2 BAG OR OVER, WITH OR WITHOUT SKIP), MULCH MACHINE, OILER, PUMP (CENTRIFUGAL, UP TO 3 INCHES), ROOT CUTTER, STUMP CHIPPER, TOWER CRANE (OILER), TRACTOR (CATERPILLAR OR WHEEL VIBRATOR) NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 LEVEL C WITH BOOM LENGTH OF 100 FT. OR MORE .25 | $54.21 | $39.99 | $94.20 |
| POWER EQUIPMENT OPERATORS: GROUP 4 (BUILDING CONSTRUCTION) COMPRESSOR, COMPRESSOR (ON CRANE), COMPRESSOR (PILE WORK), COMPRESSOR (STONE SETTING), CONCRETE BREAKER, CONCRETE SAW OR CUTTER, FORKLIFT (WALK BEHIND, POWER OPERATED), GENERATOR-PILE WORK, GENERATOR, HYDRA HAMMER, MECHANICAL COMPACTORS (HAND OPERATED), OILER (TRUCK CRANE), PIN PULLER, PORTABLE HEATERS, POWERBROOM, POWER BUGGIES, PUMP (DOUBLE ACTION DIAPHGRGM), PUMP (GYPSUM), TRENCH MACHINE (HAND), WELDING MACHINE NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 | $56.54 | $39.99 | $96.53 |
| POWER EQUIPMENT OPERATORS: GROUP 3(BUILDING CONSTRUCTION) COMRPESSOR (STRUCTURAL STEEL), COMPRESSOR (2 OR MORE IN BATTERY), CONCRETE FINISHING MCHINE, CONCRETE SPREADER, CONVEYOR, CURB MACHINE (ASPHALT OR CONCRETE), CURING MACHINE, FIREMAN, HOIST (1 DRUM), MICRO-TRAP, (SELF CONTAINED, NEGATIVE AIR MACHINE), PUMP (4 INCHES OR OVER), PUMP (HYDRAULIC), PUMP (JET), PUMP (SUMBERSIBLE), PUMP (WELL POINT), PULVI-MIXER, RIDGE CUTTER, ROLLER (DIRT), STRIPING MACHINE, VAC-ALL, WELDING AND BURNING, WELDING MACHINE (PILE WORK), WELDING MACHINE (STRUCTURAL STEEL) NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 1.00 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 | $73.78 | $39.99 | $113.77 |
| POWER EQUIPMENT OPERATORS: GROUP 2 (BUILDING CONSTRUCTION) BACKHOE, BOOM TRUCK, BULLDOZER, CHERYPICKER, CONVEYOR (MULTI), DINKY LOCOMOTIVE, FORKLIFT, HOIST, 2 DRUM, LOADING MACHINE, LOADING MACHINE (FRONT END) MECHANICAL COMPACTORS, (MACHINE DRAWN), MULCH MACHINE (MACHINE-FED), MECHANIC, POWER WINCH, OTHER THAN STONE/STRUCTURAL STEEL, POWER WINCH (TRUCK MOUNTED OTHER THAN STONE STEEL) PUMP (HYDRAULIC, WITH BORING MACHINE), ROLLER, (ASPHALT), SCOOP (CARRY-ALL SCRAPER), TOWER CRANE (MAINTENANCE MAN), TRENCHING MACHINE NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 1.00 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 | $76.44 | $39.99 | $116.43 |
| POWER EQUIPMENT OPERATORS: GROUP 1 (BUILDING CONSTRUCTION) ASPHALT SPREADER, BACKHOE CRAWLER CAPACITY OVER CATER- PILLER 225 AND LOMATSU 300, BOILER (THERMOPLASTIC), CHERRY PICKER, OVER 50 TONS, CMI OR MAXIM SPREADER, CONCRETE PUMP (WITH OILER), CRANE (CRAWLER TRUCK), CRANE (ON BARGE), CRANE (STONE SETTING), CRANE (STRUCTURAL STEEL), CRANE (WITH CLAM SHELL), DERRICK, DRAGLINE, DREDGE, GRADALL, GRADER, HOIST (3 DRUM), LOADING MACHINE (BUCKET) CAP OF 10 YDS OR OVER MICRO-TRAP, WITH COMPRESSOR (NEGATIVE AIR MACHINE), MILLING MACHINE, LARGE PILE DRIVER, POWER WINCH, STONE SETTING/STRUCTURAL STEEL, POWER WINCH (TRUCK MOUNTED/STONE STEEL) POWERHOUSE, ROAD PAVER SCOOP, CARRY-ALL, SCRAPER IN TANDEM SHOVEL, SIDEBOOM TRACTOR, SIDEBOOM TRACTOR (USED IN TANK WORK), STONE SPREADER (SELF PROPELLED TANK WORK), ZAMBONI (ICE MACHINE) NOTES: HAZMAT PREMIUMS: LEVEL A 1.50 LEVEL D 1.00 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 | $80.43 | $39.99 | $120.42 |
| POWER EQUIPMENT OPERATORS: GROUP 6 (HEAVY & HIGHWAY) WELL DRILLERS NOTES: HAZMAT PREMIUMS: LEVEL C 1.50 LEVEL D 1.00 TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: BOOM LENGTHS (INCLUDING JIB) 100-149 FT 1.00 BOOM LENGHTS (INCLUDING JIB) 150-249 FT 1.50 .25 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 | $44.37 | $12.95 | $57.32 |
| POWER EQUIPMENT OPERATORS: GROUP 5 (HEAVY & HIGHWAY) BATCHING PLANT (ON SITE OF JOB), GENERATOR (SMALL), GRINDER, MIXER (WITH SKIP), MIXER (2 SMALL WITH OR WITHOUT SKIP), MIXER (2 BAG OR OVER, WITH OR WITHOUT SKIP), MULCH MACHINE, OILER, PUMP (CENTRIFUGAL, UP TO 3 INCHES), ROOT CUTTER, STUMP CHIPPER, TOWER CRANE (OILER), TRACK TAMPER (2 ENGINEERS, EACH), TRACTOR (CATERPILLAR OR WHEEL), VIBRATOR, WORK BOAT (DECKHAND), NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 CRAWLER CRANES LONG BOOM PREMIUMS: BOOM LENGTHS (INCLUDING JIB) 100-149 FT 1.00 LENGTH OF 100 FT. OR MORE .25 | $56.55 | $40.15 | $96.70 |
| POWER EQUIPMENT OPERATORS: GROUP 4 (HEAVY & HIGHWAY) COMPRESSOR, COMPRESSOR ON CRANE, COMPRESSOR (PILE WORK), COMPRESSOR (STONE SETTING), CONCRETE BREAKER, CONCRETE SAW OR CUTTER, FORK LIFT (WALK BEHIND, POWER OPERATED), GENERATOR- PILE WORK, GENERATOR, HYDRA HAMMER, MECHANICAL COMPOACTORS (HAND OPERATED), OILER (TRUCK CRANE), PIN PULLER, PORTABLE HEATERS, POWERBROOM, POWER BUGGIES, POWER GRINDERS, PUMP (DOUBLE ACTION DIAPHRAGM), PUMP GYPSUM, PUMP (SINGLE ACTION 1 TO 3 INCHES), TRENCH MACHINE HAND, WELDING MACHINE NOTES: HAZMAT PREMIUMS: LEVEL A 1.00 BOOM LENGHTS (INCLUDING JIB) 150-249 FT 1.50 BOOM LENGHTS (INCLUDING JIB) 250-349 FT 2.00 BOOM LENGTHS (INCLUDING JIB) 350 FT 3.00 CRANES USING CLAMSHELL BUCKETS .25 FRONT END LOADER 10 YDS AND ABOVE .25 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 | $58.93 | $40.15 | $99.08 |
| POWER EQUIPMENT OPERATORS: GROUP 3 (HEAVY & HIGHWAY) CURB MACHINE (ASPHALT OR CONCRETE), MAINTENANCE ENGINEER (SMALL EQUIPMENT), MAINTENANCE ENGINEER (WELL-POINT) MECHANIC (FIELDMAN), MICRO-TRAP (SELF CONTAINED, NEGATIVE AIR MACHINE), MILLING MACHINE (SMALL), PULVI-MIXER, PUMP (4 INCHES OR OVER), PUMP HYDRAULIC, PUMP JET, PUMP SUBMERSIBLE, PUMP (WELL POINT), ROLLER DIRT, VAC-ALL, WELDING AND BURNING, COMPRESSOR (STRUCTURAL STEEL), COMPRESSOR (2 OR MORE BATTERY), CONCRETE FINISHING MACHINE, CONCRETE SPREADER, CONVEYOR, CURING MACHINE, FIREMAN, HOIST (ONE DRUM), RIDGE CUTTER, STRIPING MACHINE, WELDING MACHINE (PILE WORK), WELDING MACHINE (STRUCTURAL STEEL). NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 LEVEL C PREMIUMS: BOOM LENGTHS (INCLUDING JIB) 100-149 FT 1.00 BOOM LENGHTS (INCLUDING JIB) 150-249 FT 1.50 BOOM LENGHTS (INCLUDING JIB) 250-349 FT 2.00 3.00 CRANES USING CLAMSHELL BUCKETS .25 FRONT END LOADER 10 YDS AND ABOVE .25 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 | $76.61 | $40.15 | $116.76 |
| POWER EQUIPMENT OPERATORS: GROUP 2 (HEAVY & HIGHWAY) BULLDOZER, BACKHOE, BOOM TRUCK, BORING MACHINE/AUGUR, CHERRYPICKER, CONVEYOR (MULTI), DINKY LOCOMOTIVE, FORKLIFT, HOIST (2 DRUM), LOADING MACHINE, LOADING MACHINE (FRONT END), MECHANICAL COMPACTOR (MACHINE DRAWN), MECHANIC, MULCH MACHINE (MACHINE- FED), POWER WINCH (OTHER THAN STONE/STRUCTURAL STEEL), POWER WINCH (TRUCK MOUNTED/OTHER THAN STONE STEEL), PUMP HYDRAULIC (WITH BORING MACHINE), ROLLER (ASPHALT), SCOOP (CARRY-ALL, SCRAPER), TOWER CRANE (MAINTENANCE MAN), TRENCHING MACHINE, VERMEER CUTTER, WORK BOAT NOTES: HAZMAT PREMIUMS: LEVEL A 1.00 BOOM LENGHTS (INCLUDING JIB) 150-249 FT 1.50 BOOM LENGHTS (INCLUDING JIB) 250-349 FT 2.00 BOOM LENGTHS (INCLUDING JIB) 350 FT 3.00 CRANES USING CLAMSHELL BUCKETS .25 FRONT END LOADER 10 YDS AND ABOVE .25 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 | $79.33 | $40.15 | $119.48 |
| POWER EQUIPMENT OPERATORS: GROUP 1 (HEAVY & HIGHWAY) ASPHALT SPREADER, BACKHOE CRAWLER (CAPACITY OVER CATERPILLER 225 AND KOMATSU 300), BOILER (THERMOPLASTIC), BORING MACHINE (POST HOLE), CGHERRY PICKER (OVER 50 TON), CMI OR MAXIM SPREADER, CONCRETE PUMP, WITH OILER, CRANE (CRAWLER TRUCK), CRANE (ON BARGE), CRANE (STONE SETTING) CRANE (STRUCTURAL STEEL), CRANE (WITH CLAM SHELL), DERRICK, DRAGLINE, DREDGE, GRADALL, GRADER, HOIST (3 DRUMS), LOADING MACHINE (BUCKET) CAPACITY OF 10 YARDS OR OVER, MICRO-TRAP (WITH COMPRESSOR-NEGATIVE AIR MACHINE), MILLING MACHINE (LARGE), PILEDRIVER, POWER WINCH (STONE SETTING STRUCTURAL STEEL), POWER WINCH (TRUCK MOUNTED/STONE STEEL), POWER-HOUSE, ROAD PAVER, SCOOP, CARRY ALL (SCRAPER IN TANDEM), SHOVEL, SIDEBOOM TRACTOR, SIDEBOOM TRACTOR (USED IN TANK WORK), STONE SPREADER (SELF-PROPELLED), TANK WORK, TOWER CRANE NOTES: HAZMAT PREMIUMS: C 1.50 LEVEL D BOOM PREMIUMS: BOOM LENGTHS (INCLUDING JIB) 100-149 FT 1.00 BOOM LENGHTS (INCLUDING JIB) 150-249 FT 1.50 BOOM LENGHTS (INCLUDING JIB) 250-349 FT 2.00 3.00 CRANES USING CLAMSHELL BUCKETS .25 FRONT END LOADER 10 YDS AND ABOVE .25 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 | $84.70 | $40.15 | $124.85 |
| IRONWORKER (METALLIC LATHERS AND REINFORCING IRONWORKERS) | $57.00 | $32.96 | $89.96 |
| IRONWORKER (STONE DERRICKMAN) | $60.40 | $60.14 | $120.54 |
| IRONWORKER: STRUCTURAL | $58.95 | $92.02 | $150.97 |
| IRONWORKER: ORNAMENTAL | $48.15 | $67.62 | $115.77 |
| LABORERS: PLASTERERS TENDERS (BUILDING) | $42.55 | $34.79 | $77.34 |
| LABORERS (BUILDING) | $42.55 | $34.79 | $77.34 |
| LABORERS: ASBESTOS (REMOVAL, ABATEMENT, ENCAPSULATION OR DECONTAMINATION OF ASBESTOS); LEAD; & HAZARDOUS WASTE LABORERS (HAZARDOUS WASTE, HAZARDOUS MATERIALS, BIOCHEMICAL AND MOLD REMEDIATION, HVAC, DUCT CLEANING, RE-SPRAY FIREPROOFING, ETC) (BUILDING CONSTRUCTION) | $41.15 | $20.90 | $62.05 |
| LABORERS: REGULAR LABORERS (HEAVY & HIGHWAY) A. | $45.49 | $35.98 | $81.47 |
| LABORERS: ASPHALT SHOVELERS, ROLLER BOYS & TAMPERS (HEAVY & HIGHWAY) A. | $49.96 | $35.98 | $85.94 |
| LABORERS: ASPHALT RAKERS; FORMSETTERS (HEAVY & HIGHWAY) A. | $51.43 | $35.98 | $87.41 |
| PAINTER (SPRAY, SCAFFOLD, SANDBLASTING) | $47.75 | $44.11 | $91.86 |
| PAINTER (PAINTERS, DRYWALL FINISHERS) | $44.75 | $44.11 | $88.86 |
| PAINTER (GLAZIERS) | $49.20 | $57.20 | $106.40 |
| PAINTERS: (STUCTURAL STEEL AND BRIDGE) | $56.25 | $55.14 | $111.39 |
| PAINTERS: (DRYWALL TAPERS/POINTERS) | $48.47 | $35.91 | $84.38 |
| PLASTERER | $48.51 | $32.78 | $81.29 |
| CEMENT MASON/CONCRETE FINISHER | $59.87 | $41.81 | $101.68 |
| PLUMBER (RESIDENTIAL CONSTRUCTION) | $36.05 | $19.63 | $55.68 |
| PLUMBER (BUILDING CONSTRUCTION) | $60.73 | $45.75 | $106.48 |
| PLUMBER, SERVICE FITTERS | $47.85 | $23.96 | $71.81 |
| ROOFER | $51.25 | $47.36 | $98.61 |
| SHEET METAL WORKER (RESIDENTIAL CONSTRUCTION) | $35.79 | $25.37 | $61.16 |
| SHEET METAL WORKER (BUILDING CONSTRUCTION) | $53.60 | $60.74 | $114.34 |
| TRUCK DRIVER | $45.65 | $56.20 | $101.85 |