NJ20260001: rev 1 → rev 2

3 rate changes, 16 added, 18 removed.

Rate changes

Rates below include fringe (the full hourly package). Enter your remaining crew hours per classification to price this change for a job.

ClassificationOld totalNew totalΔ/hrHours on jobCost impact
CARPENTER$57.57$91.44+33.87
ELECTRICIAN: CABLE SPLICER (BURLINGTON COUNTY (NORTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DELAWARE RIVER, IN A SOUTHEASTERLY DIRECTION, TO THE BURLINGTON - MT. HOLLY ROAD; THEN, SOUTH-SOUTHEAST ALONG THE BURLINGTON - MT. HOLLY ROAD TO THE TOWN OF MT. HOLLY, INCLUDES MT. HOLLY; THEN, EAST ALONG THE PENNSYLVANIA RAILROAD TO THE TOWN OF NEW LISBON, INCLUDES NEW LISBON; THEN, CONTINUING ALONG THE PENNSYLVANIA RAILROAD TO THE OCEAN COUNTY LINE); MERCER COUNTY$129.62$105.81-23.81
ELECTRICIANS:: ELECTRICIAN AND CABLE SPLICER (ATLANTIC COUNTY; BURLINGTON COUNTY (SOUTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DELAWARE RIVER, IN A SOUTHEASTERLY DIRECTION, TO THE BURLINGTON - MT. HOLLY ROAD; THEN, SOUTH-SOUTHEAST ALONG THE BURLINGTON - MT. HOLLY ROAD TO THE TOWN OF MT. HOLLY, DOES NOT INCLUDE MT. HOLLY; THEN, EAST ALONG THE PENNSYLVANIA RAILROAD TO THE TOWN OF NEW LISBON, DOES NOT INCLUDE NEW LISBON; THEN, CONTINUING ALONG THE PENNSYLVANIA$61.00$103.81+42.81

Added classifications

LINE CONSTRUCTION: CONTINUOUS PIPE-TYPE UNDERGROUND OIL-FILLED TRANSMISSION CONDUIT INSTALLATIONS: (LINE TECHNICIAN; CABLE SPLICER; HEAVY EQUIPMENT OPERATOR)$61.84$40.04
LINE CONSTRUCTION: CONTINUOUS PIPE-TYPE UNDERGROUND OIL-FILLED TRANSMISSION CONDUIT INSTALLATIONS: (GROUND PERSON; TRUCK WITH WINCH OPERATOR)$49.47$32.03
LINE CONSTRUCTION: ALL OTHER WORK: (LINE TECHNICIAN; CABLE SPLICER; HEAVY EQUIPMENT OPERATOR) BURLINGTON COUNTY (NORTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DELAWARE RIVER, IN A SOUTHEASTERLY DIRECTION, TO THE BURLINGTON - MT. HOLLY ROAD; THEN, SOUTH-SOUTHEAST ALONG THE BURLINGTON - MT. HOLLY ROAD TO THE TOWN OF MT. HOLLY, INCLUDES MT. HOLLY; THEN, EAST ALONG THE PENNSYLVANIA RAILROAD TO THE TOWN OF NEW LISBON, INCLUDES NEW LISBON; THEN, CONTINUING ALONG THE PENNSYLVANIA RAILROAD TO THE OCEAN COUNTY LINE); MERCER COUNTY$61.84$40.04
LINE CONSTRUCTION: ALL OTHER WORK: (GROUND PERSON; TRUCK WITH WINCH OPERATOR) BURLINGTON COUNTY (NORTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DELAWARE RIVER, IN A SOUTHEASTERLY DIRECTION, TO THE BURLINGTON - MT. HOLLY ROAD; THEN, SOUTH-SOUTHEAST ALONG THE BURLINGTON - MT. HOLLY ROAD TO THE TOWN OF MT. HOLLY, INCLUDES MT. HOLLY; THEN, EAST ALONG THE PENNSYLVANIA RAILROAD TO THE TOWN OF NEW LISBON, INCLUDES NEW LISBON; THEN, CONTINUING ALONG THE PENNSYLVANIA RAILROAD TO THE OCEAN COUNTY LINE); MERCER COUNTY$49.47$32.03
LINE CONSTRUCTION:: LINEMAN (ATLANTIC COUNTY; BURLINGTON COUNTY (SOUTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DELAWARE RIVER, IN A SOUTHEASTERLY DIRECTION, TO THE BURLINGTON - MT. HOLLY ROAD; THEN, SOUTH-SOUTHEAST ALONG THE BURLINGTON - MT. HOLLY ROAD TO THE TOWN OF MT. HOLLY, DOES NOT INCLUDE MT. HOLLY; THEN, EAST ALONG THE PENNSYLVANIA RAILROAD TO THE TOWN OF NEW LISBON, DOES NOT INCLUDE NEW LISBON; THEN, CONTINUING ALONG THE PENNSYLVANIA RAILROAD TO THE$57.65$49.77
LINE CONSTRUCTION:: HEAVY EQUIPMENT OPERATOR (ATLANTIC COUNTY; BURLINGTON COUNTY (SOUTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DELAWARE RIVER, IN A SOUTHEASTERLY DIRECTION, TO THE BURLINGTON - MT. HOLLY ROAD; THEN, SOUTH-SOUTHEAST ALONG THE BURLINGTON - MT. HOLLY ROAD TO THE TOWN OF MT. HOLLY, DOES NOT INCLUDE MT. HOLLY; THEN, EAST ALONG THE PENNSYLVANIA RAILROAD TO THE TOWN OF NEW LISBON, DOES NOT INCLUDE NEW LISBON; THEN, CONTINUING ALONG THE PENNSYLVANIA$46.12$42.70
LINE CONSTRUCTION:: GROUNDMEN (ATLANTIC COUNTY; BURLINGTON COUNTY (SOUTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DELAWARE RIVER, IN A SOUTHEASTERLY DIRECTION, TO THE BURLINGTON - MT. HOLLY ROAD; THEN, SOUTH-SOUTHEAST ALONG THE BURLINGTON - MT. HOLLY ROAD TO THE TOWN OF MT. HOLLY, DOES NOT INCLUDE MT. HOLLY; THEN, EAST ALONG THE PENNSYLVANIA RAILROAD TO THE TOWN OF NEW LISBON, DOES NOT INCLUDE NEW LISBON; THEN, CONTINUING ALONG THE PENNSYLVANIA RAILROAD TO TH$30.88$33.36
LINE CONSTRUCTION: CONTINUOUS PIPE-TYPE UNDERGROUND OIL-FILLED TRANSMISSION CONDUIT INSTALLATIONS: (LINE TECHNICIAN/WELDER) WORK WITH HAZARDOUS MATERIALS: 10% PER HOUR ADDITIONAL$53.35$38.81
LINE CONSTRUCTION: CONTINUOUS PIPE-TYPE UNDERGROUND OIL-FILLED TRANSMISSION CONDUIT INSTALLATIONS: (LINE TECHNICIAN, CABLE SPLICER, X-RAY TECHNICIAN, AND EQUIPMENT REPAIR PERSON) WORK WITH HAZARDOUS MATERIALS: 10% PER HOUR ADDITIONAL$53.35$38.81
LINE CONSTRUCTION: ALL OTHER WORK: (LINE TECHNICIAN, CABLE SPLICER, AND EQUIPMENT OPERATOR) (MONMOUTH AND OCEAN COUNTIES) WORK WITH HAZARDOUS MATERIALS: 10% PER HOUR ADDITIONAL$53.35$38.81
LINE CONSTRUCTION: CONTINUOUS PIPE-TYPE UNDERGROUND OIL-FILLED TRANSMISSION CONDUIT INSTALLATIONS: (CRANE OPERATOR)$45.55$29.86
LINE CONSTRUCTION: CONTINUOUS PIPE-TYPE UNDERGROUND OIL-FILLED TRANSMISSION CONDUIT INSTALLATIONS: (CABLE SPLICER)$45.55$29.86
TRUCK DRIVERS:, GROUP 5 MECHANIC (ATLANTIC COUNTY) HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE WHERE THE WORKER IS NOT WORKING IN A ZONE REQUIRING LEVEL A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY. BEREAVEMENT LEAVE: ANY WORKER HAVING A DEATH IN HIS OR HER IMMEDIATE FAMILY (PARENT, SPOUSE, CHILD, BROTHER OR SISTER, MOTHER-IN-LAW OR FATHER-IN-LAW) SHALL BE GIVEN THREE DAYS TIME OFF WITH PAY AT THE TIME OF DEATH UPON FURNISHING PROOF OF SAID DEATH. THIS PROVISION SHALL ALSO APPLY TO GRANDPARENTS, WHEN LIVING WITH THE WORKER$48.58$25.98
TRUCK DRIVERS:, GROUP 4 TRAILER TRUCK DRIVER, WINCH TRUCK DRIVER, OFF-ROAD DUMP TRUCK DRIVER, FUEL TRUCK DRIVER, TRACTOR TRAILER DRIVER, ASPHALT OIL DISTRIBUTOR DRIVER, OFF-ROAD WATER TRUCK DRIVER (ATLANTIC COUNTY) HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. WASTE SITE WHERE THE WORKER IS NOT WORKING IN A ZONE REQUIRING LEVEL A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY. BEREAVEMENT LEAVE: ANY WORKER HAVING A DEATH IN HIS OR HER IMMEDIATE FAMILY (PARENT, SPOUSE, CHILD, BROTHER OR SISTER, MOTHER-IN-LAW OR FATHER-IN-LAW) SHALL BE GIVEN THREE DAYS TIME OFF WITH PAY AT THE TIME OF DEATH UPON FURNISHING PROOF OF SAID DEATH. THIS PROVISION SHALL ALSO APPLY TO GRANDPARENTS, WHEN LIVING WITH THE WORKER$48.58$25.98
TRUCK DRIVERS:, GROUP 3 TOW TRUCK DRIVER (ATLANTIC COUNTY) HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. WASTE SITE WHERE THE WORKER IS NOT WORKING IN A ZONE REQUIRING LEVEL A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY. BEREAVEMENT LEAVE: ANY WORKER HAVING A DEATH IN HIS OR HER IMMEDIATE FAMILY (PARENT, SPOUSE, CHILD, BROTHER OR SISTER, MOTHER-IN-LAW OR FATHER-IN-LAW) SHALL BE GIVEN THREE DAYS TIME OFF WITH PAY AT THE TIME OF DEATH UPON FURNISHING PROOF OF SAID DEATH. THIS PROVISION SHALL ALSO APPLY TO GRANDPARENTS, WHEN LIVING WITH THE WORKER$48.23$25.98
TRUCK DRIVERS:, GROUP 2 TRUCK DRIVER, DUMP TRUCK DRIVER, WATER TRUCK DRIVER, TRANSIT MIX DRIVER, PICK-UP TRUCK DRIVER, TANK TRUCK DRIVER, TRACK TRUCK DRIVER, AGITATOR TRUCK DRIVER, CONCRETE MOBILE UNIT DRIVER, STRINGER BEAD TRUCK DRIVER, ROSS CARRIER DRIVER, WAREHOUSE FORKLIFT DRIVER, A-FRAME TRUCK DRIVER, GIN POLE TRUCK DRIVER, FORM TRUCK DRIVER, DRIVER FOR TRUCK HAVING SELF-LOADING/UNLOADING ATTACHMENT, VACUUM TRUCK/TRAILER DRIVER (ATLANTIC COUNTY) HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE WHERE THE WORKER IS NOT WORKING IN A ZONE REQUIRING LEVEL A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY. BEREAVEMENT LEAVE: ANY WORKER HAVING A DEATH IN HIS OR HER IMMEDIATE FAMILY (PARENT, SPOUSE, CHILD, BROTHER OR SISTER, MOTHER-IN-LAW OR FATHER-IN-LAW) SHALL BE GIVEN THREE DAYS TIME OFF WITH PAY AT THE TIME OF DEATH UPON FURNISHING PROOF OF SAID DEATH. THIS PROVISION SHALL ALSO APPLY TO GRANDPARENTS, WHEN LIVING WITH THE WORKER$48.23$25.98

Removed classifications

BURLINGTON COUNTY (north of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington - Mt. Holly road; then, south-southeast along the Burlington - Mt. Holly road to the town of Mt. Holly, includes Mt. Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, includes New Lisbon; then, continuing along the Pennsylvania Railroad to the Ocean County line); MERCER COUNTY - Line construction: Continuous pipe-type underground oil-filled transmission conduit installations: Ground person; truck with winch operatorwas $49.47
BURLINGTON COUNTY (north of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington - Mt. Holly road; then, south-southeast along the Burlington - Mt. Holly road to the town of Mt. Holly, includes Mt. Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, includes New Lisbon; then, continuing along the Pennsylvania Railroad to the Ocean County line); MERCER COUNTY - Line technician; cable splicer; heavy equipment operatorwas $61.84
BURLINGTON COUNTY (north of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington - Mt. Holly road; then, south-southeast along the Burlington - Mt. Holly road to the town of Mt. Holly, includes Mt. Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, includes New Lisbon; then, continuing along the Pennsylvania Railroad to the Ocean County line); MERCER COUNTY - All other work: Ground person; truck with winch operatorwas $49.47
ELECTRICIAN - Electricianwas $61.84
Electricians - Cable splicer on lead cablewas $46.51
ATLANTIC COUNTY; BURLINGTON COUNTY (south of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington - Mt. Holly road; then, south-southeast along the Burlington - Mt. Holly road to the town of Mt. Holly, does not include Mt. Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, does not include New Lisbon; then, continuing along the Pennsylvania Railroad to the Ocean County line); CAMDEN, CAPE MAY, CUMBERLAND, GLOUCESTER AND SALEM COUNTIES - Line construction: Groundmenwas $30.88
ATLANTIC COUNTY; BURLINGTON COUNTY (south of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington - Mt. Holly road; then, south-southeast along the Burlington - Mt. Holly road to the town of Mt. Holly, does not include Mt. Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, does not include New Lisbon; then, continuing along the Pennsylvania Railroad to the Ocean County line); CAMDEN, CAPE MAY, CUMBERLAND, GLOUCESTER AND SALEM COUNTIES - Heavy equipment operatorwas $46.12
ATLANTIC COUNTY; BURLINGTON COUNTY (south of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington - Mt. Holly road; then, south-southeast along the Burlington - Mt. Holly road to the town of Mt. Holly, does not include Mt. Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, does not include New Lisbon; then, continuing along the Pennsylvania Railroad to the Ocean County line); CAMDEN, CAPE MAY, CUMBERLAND, GLOUCESTER AND SALEM COUNTIES - Linemanwas $57.65
MONMOUTH AND OCEAN COUNTIES - Line construction: Continuous pipe-type underground oil-filled transmission conduit installations: Electrical installation equipment operators: Hole- digging equipment; truck with winch or pole, and steel hand; truck without winch; ground personwas $30.30
MONMOUTH AND OCEAN COUNTIES - Line technician, cable splicer, x-ray technician, and equipment repair personwas $53.35
MONMOUTH AND OCEAN COUNTIES - Line technician/welderwas $53.35
MONMOUTH AND OCEAN COUNTIES - Line technician, cable splicer, and equipment operatorwas $53.35
Brush and rollerwas $45.55
Spraywas $45.55
ATLANTIC COUNTY - Truck drivers: GROUP 2was $48.23
ATLANTIC COUNTY - GROUP 3was $48.23
ATLANTIC COUNTY - GROUP 4was $48.58
ATLANTIC COUNTY - GROUP 5was $48.58