Highway construction wages: Rockingham, New Hampshire
Wage determination NH20260040 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NH20260040 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/NH20260040/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: LOWBOY TRUCK | $22.76 | $5.07 | $27.83 |
| TRUCK DRIVER: DUMP TRUCK | $19.47 | $3.22 | $22.69 |
| TRAFFIC CONTROL: FLAGGER | $13.17 | $1.37 | $14.54 |
| PAINTER: SPRAY | $27.29 | $6.95 | $34.24 |
| OPERATOR: ROLLER | $23.35 | $5.98 | $29.33 |
| OPERATOR: POUNDER | $36.82 | $10.41 | $47.23 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.32 | $6.23 | $31.55 |
| OPERATOR: MILLING MACHINE | $28.55 | $6.88 | $35.43 |
| OPERATOR: MECHANIC | $24.53 | $8.36 | $32.89 |
| OPERATOR: LOADER | $25.69 | $6.28 | $31.97 |
| OPERATOR: GRADER/BLADE | $27.77 | $6.79 | $34.56 |
| OPERATOR: CRANE | $29.56 | $3.29 | $32.85 |
| OPERATOR: BULLDOZER | $25.99 | $6.75 | $32.74 |
| OPERATOR: BUCKET | $30.00 | $0.00 | $30.00 |
| OPERATOR: BROOM/SWEEPER | $25.73 | $0.00 | $25.73 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.54 | $7.11 | $28.65 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.98 | $6.50 | $33.48 |
| OPERATOR: AUGER | $26.07 | $3.42 | $29.49 |
| LABORER: PIPELAYER | $19.66 | $5.28 | $24.94 |
| LABORER: LANDSCAPE | $18.06 | $0.00 | $18.06 |
| LABORER: COMMON OR GENERAL | $19.15 | $2.60 | $21.75 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $18.30 | $2.75 | $21.05 |
| IRONWORKER, STRUCTURAL | $34.45 | $17.20 | $51.65 |
| IRONWORKER, REINFORCING | $22.71 | $8.19 | $30.90 |
| INSTALLER - GUARDRAIL | $31.12 | $9.72 | $40.84 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $21.63 | $0.00 | $21.63 |
| FENCE ERECTOR (CHAIN LINK FENCE) | $19.59 | $0.00 | $19.59 |
| ELECTRICIAN | $28.08 | $2.78 | $30.86 |
| CEMENT MASON/CONCRETE FINISHER | $22.44 | $0.00 | $22.44 |
| CARPENTER, EXCLUDES FORM WORK | $26.09 | $2.51 | $28.60 |
| CARPENTER (FORM WORK ONLY) | $24.02 | $2.82 | $26.84 |