Highway construction wages: Hillsborough, New Hampshire
Wage determination NH20260039 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NH20260039 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/NH20260039/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: LOWBOY TRUCK | $22.75 | $4.95 | $27.70 |
| TRUCK DRIVER: DUMP TRUCK | $19.06 | $3.37 | $22.43 |
| TRAFFIC CONTROL: FLAGGER | $14.82 | $1.37 | $16.19 |
| PAINTER: SPRAY | $27.29 | $6.95 | $34.24 |
| OPERATOR: ROLLER | $27.19 | $6.12 | $33.31 |
| OPERATOR: POUNDER | $35.06 | $7.75 | $42.81 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $28.25 | $6.51 | $34.76 |
| OPERATOR: MILLING MACHINE | $29.25 | $5.47 | $34.72 |
| OPERATOR: MECHANIC | $25.12 | $3.44 | $28.56 |
| OPERATOR: LOADER | $25.40 | $7.51 | $32.91 |
| OPERATOR: GRADER/BLADE | $25.96 | $6.00 | $31.96 |
| OPERATOR: CRANE | $29.76 | $3.29 | $33.05 |
| OPERATOR: BULLDOZER | $25.97 | $6.59 | $32.56 |
| OPERATOR: BUCKET | $30.00 | $0.00 | $30.00 |
| OPERATOR: BROOM/SWEEPER | $23.09 | $5.09 | $28.18 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.21 | $3.98 | $24.19 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.98 | $7.21 | $32.19 |
| OPERATOR: AUGER | $26.07 | $0.00 | $26.07 |
| LABORER: PIPELAYER | $19.02 | $2.72 | $21.74 |
| LABORER: LANDSCAPE | $18.34 | $2.85 | $21.19 |
| LABORER: COMMON OR GENERAL | $18.62 | $2.60 | $21.22 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $23.03 | $8.88 | $31.91 |
| IRONWORKER, STRUCTURAL | $34.45 | $17.20 | $51.65 |
| IRONWORKER, REINFORCING | $22.59 | $2.00 | $24.59 |
| INSTALLER - GUARDRAIL | $29.25 | $5.56 | $34.81 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $20.87 | $0.00 | $20.87 |
| FENCE ERECTOR (CHAIN LINK FENCE) | $19.59 | $0.00 | $19.59 |
| ELECTRICIAN | $29.00 | $2.78 | $31.78 |
| CEMENT MASON/CONCRETE FINISHER | $21.81 | $0.00 | $21.81 |
| CARPENTER, EXCLUDES FORM WORK | $26.23 | $2.51 | $28.74 |
| CARPENTER (FORM WORK ONLY) | $23.11 | $1.06 | $24.17 |