Heavy construction wages: Hillsborough, New Hampshire
Wage determination NH20260024 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NH20260024 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/NH20260024/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $36.12 | $22.92 | $59.04 |
| IRONWORKER (REINFORCING AND STRUCTURAL) | $33.65 | $26.12 | $59.77 |
| PIPEFITTER | $45.76 | $26.19 | $71.95 |
| TRUCK DRIVER: DUMP TRUCK | $19.02 | $5.73 | $24.75 |
| TRAFFIC CONTROL: FLAGGER | $17.24 | $1.54 | $18.78 |
| PAINTER (BRUSH AND ROLLER) | $30.00 | $25.50 | $55.50 |
| OPERATOR: ROLLER | $24.09 | $4.43 | $28.52 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $27.10 | $5.69 | $32.79 |
| OPERATOR: LOADER | $20.80 | $2.65 | $23.45 |
| OPERATOR: DRILL | $27.15 | $13.39 | $40.54 |
| OPERATOR: CRANE | $28.37 | $9.74 | $38.11 |
| OPERATOR: BULLDOZER | $21.70 | $4.09 | $25.79 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.00 | $1.84 | $26.84 |
| LABORER: PIPELAYER | $22.80 | $1.45 | $24.25 |
| LABORER: COMMON OR GENERAL | $16.93 | $1.70 | $18.63 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $23.70 | $1.54 | $25.24 |
| CEMENT MASON/CONCRETE FINISHER | $27.46 | $13.30 | $40.76 |
| CARPENTER, INCLUDES FORM WORK | $26.83 | $6.94 | $33.77 |