Building construction wages: Rockingham, New Hampshire
Wage determination NH20260022 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NH20260022 on · latest revision 1 · verify at sam.gov/wage-determination/NH20260022/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $44.36 | $36.63 | $80.99 |
| BOILERMAKER | $42.83 | $25.29 | $68.12 |
| BRICKLAYER | $43.91 | $28.47 | $72.38 |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING AND ALARM INSTALLATION) | $36.12 | $22.92 | $59.04 |
| ELEVATOR MECHANIC A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, CHRISTMAS DAY AND THE FRIDAY AFTER THANKSGIVING. B. VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE; 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT | $74.17 | $38.44 | $112.61 |
| IRONWORKER (REINFORCING AND STRUCTURAL) | $33.65 | $26.12 | $59.77 |
| LABORER: COMMON OR GENERAL | $25.40 | $21.43 | $46.83 |
| PIPEFITTER | $45.76 | $26.19 | $71.95 |
| WATERPROOFER | $26.69 | $0.00 | $26.69 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $31.29 | $9.78 | $41.07 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $24.88 | $5.46 | $30.34 |
| ROOFER | $19.22 | $0.00 | $19.22 |
| PLUMBER, INCLUDES HVAC PIPE INSTALLATION | $26.72 | $5.56 | $32.28 |
| PAINTER: SPRAY | $22.99 | $3.28 | $26.27 |
| PAINTER (BRUSH AND ROLLER) | $18.10 | $1.58 | $19.68 |
| OPERATOR: ROLLER | $23.56 | $3.28 | $26.84 |
| OPERATOR: LOADER | $22.25 | $2.13 | $24.38 |
| OPERATOR: CRANE | $27.42 | $3.83 | $31.25 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.02 | $4.25 | $28.27 |
| LABORER: MASON TENDER - BRICK | $16.52 | $4.74 | $21.26 |
| GLAZIER | $26.75 | $3.48 | $30.23 |
| DRYWALL HANGER, INCLUDES METAL STUD INSTALLATION | $25.00 | $0.00 | $25.00 |
| DRYWALL FINISHER/TAPER | $25.00 | $0.00 | $25.00 |
| CEMENT MASON/CONCRETE FINISHER | $22.04 | $9.70 | $31.74 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION AND FORM WORK (EXCLUDES DRYWALL HANGING AND DRYWALL FINISHING/TAPING | $24.47 | $8.55 | $33.02 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.