Building construction wages: Otoe, Pawnee, Nebraska
Wage determination NE20260083 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NE20260083 on · latest revision 1 · verify at sam.gov/wage-determination/NE20260083/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $34.80 | $19.94 | $54.74 |
| ELECTRICIAN ZONE 4: 76 MILES AND OVER FROM THE MAIN POST OFFICE IN LINCOLN | $36.00 | $18.99 | $54.99 |
| ELECTRICIAN ZONE 3: 51 TO 75 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.60 | $18.94 | $54.54 |
| ELECTRICIAN ZONE 2: 36 TO 50 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.30 | $18.91 | $54.21 |
| ELECTRICIAN ZONE 1: 0 TO 35 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.00 | $18.88 | $53.88 |
| ELEVATOR MECHANIC | $55.88 | $38.44 | $94.32 |
| LABORER (MASON TENDER, BRICK & HOD) | $24.00 | $13.48 | $37.48 |
| PIPEFITTER (DOES NOT INCLUDE HVAC PIPING) | $46.25 | $21.10 | $67.35 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | $39.65 | $19.87 | $59.52 |
| TRUCK DRIVER: DUMP, LOWBOY AND TANDEM | $14.56 | $1.68 | $16.24 |
| ROOFER | $14.52 | $0.65 | $15.17 |
| PLUMBER (HVAC PIPE INSTALLATION) | $25.55 | $7.54 | $33.09 |
| PLUMBER | $26.55 | $8.87 | $35.42 |
| OPERATOR: LOADER | $16.58 | $0.94 | $17.52 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.82 | $2.22 | $24.04 |
| LABORER: COMMON OR GENERAL | $14.54 | $3.63 | $18.17 |
| IRONWORKER, STRUCTURAL | $22.96 | $4.50 | $27.46 |
| CEMENT MASON/CONCRETE FINISHER | $17.54 | $1.41 | $18.95 |
| CARPENTER, INCLUDES FORM WORK | $16.10 | $1.46 | $17.56 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.