Building construction wages: Boone, Nebraska
Wage determination NE20260065 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NE20260065 on · latest revision 1 · verify at sam.gov/wage-determination/NE20260065/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $48.48 | $33.57 | $82.05 |
| BRICKLAYER | $29.75 | $16.48 | $46.23 |
| CARPENTER (DRYWALL HANGING ONLY) | $33.42 | $18.66 | $52.08 |
| ELECTRICIAN ZONE 4: 76 MILES AND OVER FROM THE MAIN POST OFFICE IN LINCOLN | $36.00 | $18.99 | $54.99 |
| ELECTRICIAN ZONE 3: 51 TO 75 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.60 | $18.94 | $54.54 |
| ELECTRICIAN ZONE 2: 36 TO 50 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.30 | $18.91 | $54.21 |
| ELECTRICIAN ZONE 1: 0 TO 35 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.00 | $18.88 | $53.88 |
| ELEVATOR MECHANIC | $55.88 | $38.44 | $94.32 |
| IRONWORKER, STRUCTURAL | $39.00 | $22.30 | $61.30 |
| LABORER (MASON TENDER, BRICK & HOD) | $24.00 | $13.48 | $37.48 |
| PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) | $44.26 | $16.90 | $61.16 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | $46.25 | $21.10 | $67.35 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $43.79 | $28.35 | $72.14 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | $39.65 | $19.87 | $59.52 |
| TRUCK DRIVER: DUMP, LOWBOY AND TANDEM | $14.56 | $1.68 | $16.24 |
| ROOFER | $14.52 | $0.65 | $15.17 |
| OPERATOR: LOADER | $16.58 | $0.94 | $17.52 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.82 | $2.22 | $24.04 |
| LABORER: COMMON OR GENERAL | $12.07 | $2.85 | $14.92 |
| DRYWALL FINISHER/TAPER | $13.79 | $3.32 | $17.11 |
| CEMENT MASON/CONCRETE FINISHER | $17.80 | $1.34 | $19.14 |
| CARPENTER, EXCLUDES DRYWALL FINISHING/TAPING, AND DRYWALL HANGING | $17.39 | $3.13 | $20.52 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.