RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV

The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
CARPENTER (INCLUDING ACOUSTICAL CEIING INSTALLATION)$33.42$18.66$52.08
ELECTRICIAN ZONE 4: 76 MILES AND OVER FROM THE MAIN POST OFFICE IN LINCOLN$36.00$18.99$54.99
ELECTRICIAN ZONE 3: 51 TO 75 MILES FROM THE MAIN POST OFFICE IN LINCOLN$35.60$18.94$54.54
ELECTRICIAN ZONE 2: 36 TO 50 MILES FROM THE MAIN POST OFFICE IN LINCOLN$35.30$18.91$54.21
ELECTRICIAN ZONE 1: 0 TO 35 MILES FROM THE MAIN POST OFFICE IN LINCOLN$35.00$18.88$53.88
ELEVATOR MECHANIC$55.88$38.44$94.32
OPERATOR: FORKLIFT$31.06$18.69$49.75
OPERATOR: CRANE$36.44$18.69$55.13
IRONWORKER, STRUCTURAL$39.00$22.30$61.30
LABORER (MASON TENDER, BRICK & HOD)$24.00$13.48$37.48
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION$46.25$21.10$67.35
SHEET METAL WORKER (EXCLUDES INSTALLATION OF HVAC DUCT)$39.65$19.87$59.52
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK$14.09$2.49$16.58
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$21.89$6.30$28.19
ROOFER$13.57$0.77$14.34
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION$22.89$6.04$28.93
PAINTER: BRUSH, ROLLER AND SPRAY$14.26$0.00$14.26
OPERATOR: LOADER$19.27$4.00$23.27
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$21.72$2.10$23.82
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$20.68$4.93$25.61
LABORER: COMMON OR GENERAL$12.03$0.00$12.03
FORM WORKER$14.97$2.06$17.03
ELECTRICIAN: ALARM INSTALLATION$19.68$4.12$23.80
ELECTRICIAN (LOW VOLTAGE WIRING)$20.15$4.84$24.99
CEMENT MASON/CONCRETE FINISHER$15.73$2.06$17.79
CARPENTER$18.50$1.80$20.30
BRICKLAYER$24.44$0.00$24.44