Building construction wages: Douglas, Nebraska
Wage determination NE20260057 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NE20260057 on · latest revision 1 · verify at sam.gov/wage-determination/NE20260057/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $34.80 | $19.94 | $54.74 |
| CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION) | $33.42 | $18.66 | $52.08 |
| CARPENTER (DRYWALL HANGING, FINISHING/TAPING ONLY) | $33.42 | $18.66 | $52.08 |
| ELECTRICIAN | $46.40 | $20.89 | $67.29 |
| ELEVATOR MECHANIC | $55.88 | $38.44 | $94.32 |
| OPERATOR: FORKLIFT | $31.06 | $18.69 | $49.75 |
| OPERATOR: CRANE | $36.44 | $18.69 | $55.13 |
| IRONWORKER, STRUCTURAL | $39.00 | $22.30 | $61.30 |
| LABORER (MASON TENDER, BRICK & HOD) | $24.00 | $13.48 | $37.48 |
| PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) | $44.26 | $16.90 | $61.16 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION AND EXCLUDES HVAC SYSTEM INSTALLATION) | $46.25 | $21.10 | $67.35 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $43.79 | $28.35 | $72.14 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT & SYSTEM INSTALLATION) | $39.65 | $19.87 | $59.52 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $14.77 | $1.41 | $16.18 |
| ROOFER | $13.57 | $0.77 | $14.34 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $14.26 | $0.00 | $14.26 |
| OPERATOR: LOADER | $20.76 | $4.64 | $25.40 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $23.11 | $0.91 | $24.02 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.55 | $5.72 | $28.27 |
| LABORER: COMMON OR GENERAL | $15.47 | $5.34 | $20.81 |
| GLAZIER | $17.67 | $1.71 | $19.38 |
| FORM WORKER | $19.07 | $3.84 | $22.91 |
| ELECTRICIAN (LOW VOLTAGE WIRING) | $21.54 | $5.99 | $27.53 |
| CEMENT MASON/CONCRETE FINISHER | $18.44 | $4.08 | $22.52 |
| CAULKER | $17.13 | $0.00 | $17.13 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.