Heavy construction wages: Antelope, Boone, Nebraska
Wage determination NE20260043 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NE20260043 on · latest revision 1 · verify at sam.gov/wage-determination/NE20260043/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN ZONE 4: 76 MILES AND OVER FROM THE MAIN POST OFFICE IN LINCOLN | $36.00 | $18.99 | $54.99 |
| ELECTRICIAN ZONE 3: 51 TO 75 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.60 | $18.94 | $54.54 |
| ELECTRICIAN ZONE 2: 36 TO 50 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.30 | $18.91 | $54.21 |
| ELECTRICIAN ZONE 1: 0 TO 35 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.00 | $18.88 | $53.88 |
| OPERATOR: SCRAPER | $14.89 | $2.06 | $16.95 |
| OPERATOR: LOADER | $16.79 | $1.09 | $17.88 |
| OPERATOR: BULLDOZER | $15.95 | $3.04 | $18.99 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $19.47 | $4.07 | $23.54 |
| OPERATOR: BACKHOE/EXCAVATOR | $18.23 | $2.31 | $20.54 |
| LABORER: PIPELAYER | $14.23 | $0.39 | $14.62 |
| LABORER: COMMON OR GENERAL | $11.69 | $1.31 | $13.00 |
| CEMENT MASON/CONCRETE FINISHER | $18.75 | $3.25 | $22.00 |