Heavy construction wages: Blaine, Nebraska

Wage determination NE20260035 · Active · Standard · verify on SAM.gov

Blaine

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV
ClassificationRateFringeTotal
ELECTRICIAN ZONE 4: 76 MILES AND OVER FROM THE MAIN POST OFFICE IN LINCOLN$36.00$18.99$54.99
ELECTRICIAN ZONE 3: 51 TO 75 MILES FROM THE MAIN POST OFFICE IN LINCOLN$35.60$18.94$54.54
ELECTRICIAN ZONE 2: 36 TO 50 MILES FROM THE MAIN POST OFFICE IN LINCOLN$35.30$18.91$54.21
ELECTRICIAN ZONE 1: 0 TO 35 MILES FROM THE MAIN POST OFFICE IN LINCOLN$35.00$18.88$53.88
OPERATOR: SCRAPER$14.89$2.06$16.95
OPERATOR: LOADER$15.54$1.19$16.73
OPERATOR: BULLDOZER$15.95$3.04$18.99
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$19.47$4.07$23.54
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$19.71$2.59$22.30
LABORER: PIPELAYER$17.11$1.34$18.45
LABORER: COMMON OR GENERAL$13.82$0.00$13.82
CEMENT MASON/CONCRETE FINISHER$18.41$2.70$21.11
CARPENTER$22.02$2.68$24.70