Heavy construction wages: Ward, North Dakota
Wage determination ND20260043 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/ND20260043 on · latest revision 2 · verify at sam.gov/wage-determination/ND20260043/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-16 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER | $35.87 | $25.10 | $60.97 |
| ELECTRICIAN | $44.98 | $18.38 | $63.36 |
| POWER EQUIPMENT OPERATOR: ROLLER | $34.85 | $22.45 | $57.30 |
| POWER EQUIPMENT OPERATOR: LOADER | $34.00 | $22.45 | $56.45 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $35.00 | $22.45 | $57.45 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $34.00 | $22.45 | $56.45 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $34.85 | $22.45 | $57.30 |
| POWER EQUIPMENT OPERATOR: CRANE | $35.25 | $22.45 | $57.70 |
| LABORERS: COMMON OR GENERAL | $28.83 | $21.15 | $49.98 |
| TRUCK DRIVER: DUMP TRUCK | $31.95 | $18.80 | $50.75 |
| OPERATOR: GRADER/BLADE | $28.00 | $0.00 | $28.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $29.92 | $15.43 | $45.35 |
| IRONWORKER, REINFORCING | $25.28 | $0.00 | $25.28 |
| CEMENT MASON/CONCRETE FINISHER | $24.33 | $0.00 | $24.33 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.