Residential construction wages: Morton, Grand Forks, Burleigh, North Dakota

Wage determination ND20260003 · Active · Standard · verify on SAM.gov

MortonGrand ForksBurleigh

Get an email when this determination changes.This determination changed once in the last 12 months, most recently 2026-05-18: 2 rate changes, 1 removed (ELECTRICIAN (BURLEIGH AND MORTON COUNTIES) $38.94 → $38.94).
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV

The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
BRICKLAYER$32.68$13.42$46.10
ELECTRICIAN (BURLEIGH AND MORTON COUNTIES)$38.94$17.69$56.63
ELECTRICIAN: CABLE SPLICER (GRAND FORKS COUNTY)$33.20$14.62$47.82
SPRINKLER FITTER$39.04$23.99$63.03
SHEET METAL (SHEET METAL WORK (HVAC DUCT ONLY))$12.62$0.00$12.62
ROOFER$8.13$0.00$8.13
POWER EQUIPMENT OPERATORS: LOADER$18.10$0.00$18.10
POWER EQUIPMENT OPERATORS: (BACKHOE)$18.10$0.00$18.10
PLUMBER (PLUMBERS, INCLUDING HVAC PIPING)$11.42$0.00$11.42
PAINTER (PAINTERS, EXCLUDING DRYWALL FINISHING)$10.00$0.00$10.00
LABORERS: (LANDSCAPE WORKER)$8.41$0.00$8.41
LABORERS: (COMMON)$8.39$0.00$8.39
INSULATOR, BATT & BLOWN$8.00$0.00$8.00
DRYWALL HANGER$14.64$0.00$14.64
DRYWALL FINISHER/TAPER$13.61$1.06$14.67
CEMENT MASON/CONCRETE FINISHER$9.85$0.00$9.85
CARPENTER (CARPENTERS (INCLUDING THE INSTALLATION OF FORM WORK & CABINETS, EXCLUDING THE INSTALLATION OF DRYWALL & BATT & BLOWN INSULATION))$10.90$0.00$10.90

Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.