Building construction wages: Davidson + 3 more counties, North Carolina
Wage determination NC20260124 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NC20260124 on · latest revision 1 · verify at sam.gov/wage-determination/NC20260124/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $31.00 | $14.41 | $45.41 |
| IRONWORKER | $29.75 | $18.00 | $47.75 |
| PIPEFITTER | $33.96 | $13.48 | $47.44 |
| TRUCK DRIVER: DUMP TRUCK | $16.56 | $3.09 | $19.65 |
| SHEET METAL WORKER | $19.67 | $13.27 | $32.94 |
| ROOFER | $18.26 | $4.38 | $22.64 |
| PLUMBER | $19.27 | $2.48 | $21.75 |
| PAINTER | $15.31 | $1.05 | $16.36 |
| OPERATOR: ROLLER | $15.31 | $1.46 | $16.77 |
| OPERATOR: GRADER/BLADE | $22.68 | $3.27 | $25.95 |
| OPERATOR: FORKLIFT | $16.75 | $0.00 | $16.75 |
| OPERATOR: BULLDOZER | $17.54 | $2.63 | $20.17 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.22 | $0.00 | $19.22 |
| LABORER: PIPELAYER | $15.00 | $2.46 | $17.46 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $15.26 | $0.00 | $15.26 |
| LABORER: MASON TENDER - BRICK | $13.17 | $0.00 | $13.17 |
| LABORER: COMMON OR GENERAL | $12.94 | $0.00 | $12.94 |
| DRYWALL HANGER | $21.18 | $9.15 | $30.33 |
| CEMENT MASON/CONCRETE FINISHER | $18.22 | $0.00 | $18.22 |
| CARPENTER, EXCLUDES DRYWALL HANGING | $17.10 | $3.66 | $20.76 |
| BRICKLAYER | $19.13 | $0.00 | $19.13 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.