Residential construction wages: Iredell, North Carolina
Wage determination NC20260103 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NC20260103 on · latest revision 1 · verify at sam.gov/wage-determination/NC20260103/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $14.77 | $0.00 | $14.77 |
| TRUCK DRIVER: DUMP TRUCK | $14.90 | $0.00 | $14.90 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $13.71 | $0.00 | $13.71 |
| SHEET METAL WORKER | $16.75 | $0.00 | $16.75 |
| ROOFER | $15.00 | $0.00 | $15.00 |
| PLUMBER | $18.04 | $0.00 | $18.04 |
| PAINTER: SPRAY | $14.06 | $0.00 | $14.06 |
| PAINTER (BRUSH AND ROLLER) | $13.00 | $0.00 | $13.00 |
| OPERATOR: ROLLER | $13.55 | $0.00 | $13.55 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $17.45 | $0.00 | $17.45 |
| OPERATOR: LOADER | $15.13 | $0.00 | $15.13 |
| OPERATOR: GRADER/BLADE | $15.83 | $0.00 | $15.83 |
| OPERATOR: BULLDOZER | $16.83 | $0.00 | $16.83 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $18.50 | $1.56 | $20.06 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $18.50 | $0.00 | $18.50 |
| LABORER: PIPELAYER | $13.02 | $0.60 | $13.62 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.30 | $0.00 | $13.30 |
| LABORER: MASON TENDER - BRICK | $13.22 | $0.00 | $13.22 |
| LABORER: LANDSCAPE | $11.55 | $0.54 | $12.09 |
| LABORER: COMMON OR GENERAL | $11.17 | $0.00 | $11.17 |
| IRONWORKER, STRUCTURAL | $16.89 | $0.00 | $16.89 |
| IRONWORKER, ORNAMENTAL | $15.71 | $0.00 | $15.71 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY) | $17.90 | $1.82 | $19.72 |
| HVAC MECHANIC (HVAC DUCT AND PIPE INSTALLATION) | $17.79 | $1.82 | $19.61 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF SOUND AND COMMUNICATION SYSTEMS | $17.40 | $2.18 | $19.58 |
| DRYWALL HANGER | $13.56 | $0.00 | $13.56 |
| DRYWALL FINISHER/TAPER | $13.15 | $0.00 | $13.15 |
| CEMENT MASON/CONCRETE FINISHER | $15.15 | $0.00 | $15.15 |
| CARPENTER | $17.51 | $0.47 | $17.98 |
| BRICKLAYER | $18.62 | $0.00 | $18.62 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.