Building construction wages: Sampson, North Carolina
Wage determination NC20260058 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NC20260058 on · latest revision 1 · verify at sam.gov/wage-determination/NC20260058/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| PIPEFITTER (EXCLUDING HVAC SYSTEM INSTALLATION) | $31.66 | $12.69 | $44.35 |
| TRUCK DRIVER: DUMP TRUCK | $12.75 | $1.21 | $13.96 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $13.09 | $1.28 | $14.37 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.29 | $0.00 | $15.29 |
| ROOFER | $13.55 | $0.80 | $14.35 |
| PLUMBER, EXCLUDES HVAC UNIT INSTALLATION | $17.42 | $2.29 | $19.71 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $14.60 | $1.97 | $16.57 |
| OPERATOR: GRADER/BLADE | $15.71 | $1.49 | $17.20 |
| OPERATOR: CRANE | $19.25 | $2.37 | $21.62 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.98 | $0.91 | $18.89 |
| LABORER: MASON TENDER-BRICK/CEMENT/CONCRETE | $11.31 | $0.00 | $11.31 |
| LABORER: LANDSCAPE & IRRIGATION | $10.29 | $1.82 | $12.11 |
| LABORER: COMMON OR GENERAL | $10.53 | $1.39 | $11.92 |
| IRONWORKER, STRUCTURAL | $18.75 | $5.62 | $24.37 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | $15.41 | $2.60 | $18.01 |
| GLAZIER | $18.16 | $0.87 | $19.03 |
| FORM WORKER | $16.08 | $3.48 | $19.56 |
| ELECTRICIAN | $17.36 | $3.07 | $20.43 |
| CEMENT MASON/CONCRETE FINISHER | $14.02 | $0.00 | $14.02 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | $15.93 | $2.99 | $18.92 |
| CARPENTER (DRYWALL HANGING ONLY) | $18.13 | $1.31 | $19.44 |
| BRICKLAYER | $19.09 | $8.73 | $27.82 |