Building construction wages: Gaston, North Carolina
Wage determination NC20260005 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NC20260005 on · latest revision 1 · verify at sam.gov/wage-determination/NC20260005/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| DRYWALL HANGER | $29.00 | $11.20 | $40.20 |
| ELECTRICIAN | $32.31 | $13.66 | $45.97 |
| IRONWORKER | $29.75 | $18.00 | $47.75 |
| PIPEFITTER | $33.96 | $13.48 | $47.44 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $30.74 | $16.51 | $47.25 |
| TRUCK DRIVER: DUMP TRUCK | $16.56 | $3.09 | $19.65 |
| SPRINKLER FITTER | $18.35 | $3.06 | $21.41 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $19.67 | $13.27 | $32.94 |
| ROOFER | $18.26 | $4.38 | $22.64 |
| PLUMBER | $22.96 | $4.81 | $27.77 |
| PAINTER | $15.55 | $1.05 | $16.60 |
| OPERATOR: ROLLER | $15.31 | $1.46 | $16.77 |
| OPERATOR: GRADER/BLADE | $22.68 | $3.27 | $25.95 |
| OPERATOR: FORKLIFT | $16.75 | $0.00 | $16.75 |
| OPERATOR: BULLDOZER | $17.54 | $2.63 | $20.17 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.50 | $0.08 | $16.58 |
| LABORER: PIPELAYER | $15.00 | $2.46 | $17.46 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.00 | $4.54 | $17.54 |
| LABORER: MASON TENDER - BRICK | $13.17 | $0.00 | $13.17 |
| LABORER: COMMON OR GENERAL | $14.12 | $2.79 | $16.91 |
| CEMENT MASON/CONCRETE FINISHER | $18.79 | $0.00 | $18.79 |
| CARPENTER, EXCLUDES DRYWALL HANGING | $19.78 | $5.50 | $25.28 |
| BRICKLAYER | $19.00 | $0.00 | $19.00 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.