Building construction wages: Meagher, Yellowstone National Park, Montana
Wage determination MT20260059 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MT20260059 on · latest revision 1 · verify at sam.gov/wage-determination/MT20260059/1
MeagherYellowstone National Park
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| HEAT AND FROST INSULATOR | $43.81 | $21.87 | $65.68 |
| BOILERMAKER | $38.75 | $32.31 | $71.06 |
| BRICKLAYER | $30.55 | $15.75 | $46.30 |
| CARPENTER: ACOUSTICAL CEILING INSTALLATION, DRYWALL ONLY (MEAGHER COUNTY) | $32.05 | $15.02 | $47.07 |
| ELECTRICIAN: LOW VOLTAGE WIRING FOR ALARMS AND COMPUTERS (MEAGHER COUNTY ONLY) | $23.90 | $160.74 | $184.64 |
| ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING FOR ALARMS AND COMPUTERS (YELLOWSTONE NATIONAL PARK) | $29.59 | $14.13 | $43.72 |
| ELEVATOR MECHANIC | $67.61 | $38.44 | $106.05 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $36.83 | $25.30 | $62.13 |
| LABORER, ZONE 1: MASON TENDER-BRICK ZONE DEFINITIONS FOR LABORERS THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL MAINTAINED ROUTE FROM THE COUNTY COURTHOUSE OF THE FOLLOWING LISTED TOWN TO THE CENTER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, HELENA, GREAT FALLS, MISSOULA, KALISPELL TRAVEL ZONES: ZONE 1: 0 TO 30 MILES, BASE PAY ZONE 2: MILES, ADD $4.85 TO BASE PAY | $23.05 | $12.72 | $35.77 |
| PLUMBER, INCLUDES HVAC PIPE INSTALLATION | $46.45 | $19.92 | $66.37 |
| PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION | $46.45 | $19.92 | $66.37 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $39.97 | $24.40 | $64.37 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $40.00 | $22.07 | $62.07 |
| TRUCK DRIVER: DUMP TRUCK | $19.36 | $5.37 | $24.73 |
| ROOFER | $15.48 | $5.28 | $20.76 |
| PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $19.18 | $0.00 | $19.18 |
| OPERATOR: FORKLIFT | $21.44 | $8.05 | $29.49 |
| OPERATOR: EXCAVATOR | $22.20 | $6.75 | $28.95 |
| OPERATOR: CRANE | $24.04 | $7.41 | $31.45 |
| LABORER: COMMON OR GENERAL | $17.77 | $5.23 | $23.00 |
| GLAZIER | $17.93 | $2.62 | $20.55 |
| CEMENT MASON/CONCRETE FINISHER | $18.27 | $1.50 | $19.77 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, AND FORMWORK | $20.51 | $7.13 | $27.64 |