Building construction wages: Powell, Montana

Wage determination MT20260048 · Active · Standard · verify on SAM.gov

Powell

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 22026-05-18diff vs rev 1
rev 12026-05-17diff vs rev 0
rev 02026-01-30original

Current rates (rev 2)

Download CSV
ClassificationRateFringeTotal
HEAT AND FROST INSULATOR$43.81$21.87$65.68
BOILERMAKER$38.75$32.31$71.06
BRICKLAYER$33.11$17.18$50.29
CARPENTER: ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING AND FORM WORK ONLY ZONE DEFINITION: THE HOURLY RATE APPLICABLE TO EACH PROJECT IS DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL ROUTE FROM THE COUNTY COURTHOUSE OF THE FOLLOWING TOWNS TO THE CETER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL, LEWISTON, MILES CITY, AND MISSOULA ZONE 1: 0 TO 30 MILES - BASE RATE 3: OVER 60 MILES - $6.00$32.05$15.02$47.07
ELECTRICIAN$40.00$19.88$59.88
ELEVATOR MECHANIC$67.61$38.44$106.05
IRONWORKER: REINFORCING AND STRUCTURAL$36.83$25.30$62.13
LABORER, ZONE 1: MASON TENDER-BRICK ZONE DEFINITIONS FOR LABORERS THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL MAINTAINED ROUTE FROM THE COUNTY COURTHOUSE OF THE FOLLOWING LISTED TOWN TO THE CENTER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, HELENA, GREAT FALLS, MISSOULA, KALISPELL TRAVEL ZONES: ZONE 1: 0 TO 30 MILES, BASE PAY ZONE 2: MILES, ADD $4.85 TO BASE PAY$23.05$12.72$35.77
PLUMBER, INCLUDES HVAC PIPE INSTALLATION$42.80$17.28$60.08
PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION$42.80$17.28$60.08
SPRINKLER FITTER (FIRE SPRINKLERS)$39.97$24.40$64.37
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$40.00$22.07$62.07
TRUCK DRIVER: DUMP TRUCK$19.36$5.37$24.73
ROOFER$15.48$5.28$20.76
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING$19.18$0.00$19.18
OPERATOR: FORKLIFT$21.44$8.05$29.49
OPERATOR: EXCAVATOR$22.20$6.75$28.95
OPERATOR: CRANE$24.04$7.41$31.45
LABORER: COMMON OR GENERAL$17.77$5.23$23.00
GLAZIER$17.93$2.62$20.55
CEMENT MASON/CONCRETE FINISHER$18.27$1.50$19.77
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, AND FORMWORK$20.51$7.13$27.64