Residential construction wages: Lake, Mineral, Sanders, Montana
Wage determination MT20260004 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MT20260004 on · latest revision 1 · verify at sam.gov/wage-determination/MT20260004/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | $7.25 | $0.00 | $7.25 |
| POWER EQUIPMENT OPERATOR: SHOVEL/BACKHOE 1 TO 3 CU YD | $7.50 | $0.00 | $7.50 |
| PLUMBER | $8.33 | $0.00 | $8.33 |
| PAINTER: BRUSH ONLY | $7.80 | $0.00 | $7.80 |
| LABORER | $7.25 | $0.00 | $7.25 |
| ELECTRICIAN | $10.47 | $0.00 | $10.47 |
| CARPENTER | $8.93 | $1.32 | $10.25 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.