Heavy construction wages: Jones, Mississippi

Wage determination MS20260067 · Active · Standard · verify on SAM.gov

Jones

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 22026-05-18diff vs rev 1
rev 12026-05-17diff vs rev 0
rev 02026-01-23original

Current rates (rev 2)

Download CSV
ClassificationRateFringeTotal
ELECTRICIAN$33.30$11.63$44.93
IRONWORKER: STRUCTURAL$21.00$8.81$29.81
TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES$13.25$0.00$13.25
OPERATOR: BULLDOZER, INCLUDES WATER SEWER LINES$14.71$0.00$14.71
OPERATOR: TRACKHOE$14.68$0.00$14.68
LABORER: PIPELAYER, INCLUDES WATER SEWER LINES$12.00$0.00$12.00
LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES$12.71$0.00$12.71
IRONWORKER, REINFORCING$18.50$0.00$18.50
CEMENT MASON/CONCRETE FINISHER, INCLUDES WATER SEWER LINES$14.98$0.00$14.98
CARPENTER, INCLUDES FORM WORK$16.54$0.00$16.54