Heavy construction wages: Clay, Mississippi
Wage determination MS20260065 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MS20260065 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/MS20260065/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: STRUCTURAL | $21.00 | $8.81 | $29.81 |
| WATER & SEWER LINES: ELECTRICIAN | $19.36 | $7.70 | $27.06 |
| TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES | $12.00 | $0.00 | $12.00 |
| OPERATOR: BULLDOZER, INCLUDES WATER SEWER LINES | $17.60 | $0.00 | $17.60 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, INCLUDES WATER SEWER LINES | $17.01 | $0.00 | $17.01 |
| LABORER: PIPELAYER, INCLUDES WATER SEWER LINES | $13.19 | $0.00 | $13.19 |
| LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES | $12.24 | $0.00 | $12.24 |
| IRONWORKER, REINFORCING | $18.50 | $0.00 | $18.50 |
| CEMENT MASON/CONCRETE FINISHER, INCLUDES WATER SEWER LINES | $16.24 | $0.00 | $16.24 |
| CARPENTER, INCLUDES FORM WORK | $16.89 | $0.00 | $16.89 |