Heavy construction wages: Carroll, Mississippi
Wage determination MS20260064 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MS20260064 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/MS20260064/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: STRUCTURAL | $21.00 | $8.81 | $29.81 |
| TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES | $11.66 | $0.00 | $11.66 |
| OPERATOR: BULLDOZER, INCLUDES WATER SEWER LINES | $16.31 | $0.00 | $16.31 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, INCLUDES WATER SEWER LINES | $16.29 | $1.71 | $18.00 |
| LABORER: PIPELAYER, INCLUDES WATER SEWER LINES | $13.29 | $1.88 | $15.17 |
| LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES | $11.27 | $1.71 | $12.98 |
| IRONWORKER, REINFORCING | $18.50 | $0.00 | $18.50 |
| ELECTRICIAN | $21.09 | $7.61 | $28.70 |
| CEMENT MASON/CONCRETE FINISHER, INCLUDES WATER SEWER LINES | $14.95 | $0.00 | $14.95 |
| CARPENTER, INCLUDES FORM WORK | $16.78 | $0.00 | $16.78 |