Heavy construction wages: Harrison, Mississippi
Wage determination MS20260060 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MS20260060 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/MS20260060/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES | $16.03 | $0.95 | $16.98 |
| OPERATOR: CRANE | $22.66 | $4.66 | $27.32 |
| OPERATOR: BULLDOZER | $18.85 | $1.18 | $20.03 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $18.86 | $0.00 | $18.86 |
| LABORER: PIPELAYER, INCLUDES WATER SEWER LINES | $14.04 | $1.92 | $15.96 |
| LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES | $12.41 | $0.00 | $12.41 |
| IRONWORKER, STRUCTURAL | $19.00 | $0.00 | $19.00 |
| IRONWORKER, REINFORCING | $20.63 | $0.00 | $20.63 |
| ELECTRICIAN | $27.16 | $7.45 | $34.61 |
| CEMENT MASON/CONCRETE FINISHER | $17.75 | $0.00 | $17.75 |
| CARPENTER, INCLUDES FORM WORK | $17.52 | $0.00 | $17.52 |