Building construction wages: Lamar, Perry, Mississippi
Wage determination MS20260056 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MS20260056 on July 24, 2026 · latest revision 2 · verify at sam.gov/wage-determination/MS20260056/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-23 | original |
Current rates (rev 2)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $32.90 | $11.10 | $44.00 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $35.50 | $14.55 | $50.05 |
| POWER EQUIPMENT OPERATOR: CRANE | $35.50 | $14.55 | $50.05 |
| IRONWORKER, REINFORCING | $31.00 | $17.77 | $48.77 |
| PLUMBER | $29.91 | $11.97 | $41.88 |
| PIPEFITTER | $30.41 | $11.47 | $41.88 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | $30.45 | $13.88 | $44.33 |
| TRUCK DRIVER: DUMP TRUCK | $14.11 | $0.27 | $14.38 |
| TILE SETTER | $18.00 | $0.00 | $18.00 |
| ROOFER | $14.50 | $0.00 | $14.50 |
| PAINTER (BRUSH AND ROLLER) | $17.00 | $0.00 | $17.00 |
| OPERATOR: BULLDOZER | $15.14 | $1.03 | $16.17 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.53 | $0.00 | $17.53 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $12.50 | $0.00 | $12.50 |
| LABORER: COMMON OR GENERAL | $12.35 | $0.94 | $13.29 |
| IRONWORKER, STRUCTURAL | $18.05 | $0.00 | $18.05 |
| CEMENT MASON/CONCRETE FINISHER | $18.31 | $0.00 | $18.31 |
| CARPENTER | $17.44 | $5.33 | $22.77 |
| BRICKLAYER | $20.29 | $0.00 | $20.29 |