Building construction wages: Harrison, Mississippi
Wage determination MS20260050 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MS20260050 on · latest revision 2 · verify at sam.gov/wage-determination/MS20260050/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-23 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) | $32.90 | $11.10 | $44.00 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $35.50 | $14.55 | $50.05 |
| IRONWORKER, REINFORCING | $31.00 | $17.77 | $48.77 |
| PLUMBER (INCLUDES HVAC PIPE INSTALLATION (EXCLUDES HVAC UNIT INSTALLATION)) | $29.91 | $11.97 | $41.88 |
| PIPEFITTER (INCLUDES HVAC UNIT INSTALLATION (EXCLUDES HVAC PIPE INSTALLATION)) | $30.41 | $11.47 | $41.88 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | $30.45 | $13.88 | $44.33 |
| TRUCK DRIVER: DUMP TRUCK | $14.11 | $0.27 | $14.38 |
| TILE SETTER | $18.00 | $0.00 | $18.00 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $21.21 | $0.00 | $21.21 |
| ROOFER | $14.50 | $0.00 | $14.50 |
| PAINTER (BRUSH AND ROLLER) | $17.00 | $0.00 | $17.00 |
| OPERATOR: CRANE | $21.40 | $3.58 | $24.98 |
| OPERATOR: BULLDOZER | $15.14 | $1.03 | $16.17 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.93 | $1.62 | $19.55 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $12.50 | $0.00 | $12.50 |
| LABORER: COMMON OR GENERAL | $10.91 | $0.00 | $10.91 |
| IRONWORKER, STRUCTURAL | $18.51 | $0.00 | $18.51 |
| CEMENT MASON/CONCRETE FINISHER | $18.37 | $0.00 | $18.37 |
| CARPENTER, INCLUDES DRYWALL HANGING, FINISHING/TAPING AND FORM WORK | $15.90 | $0.00 | $15.90 |
| BRICKLAYER | $22.00 | $0.02 | $22.02 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.