Building construction wages: Hancock, Mississippi
Wage determination MS20260049 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MS20260049 on · latest revision 2 · verify at sam.gov/wage-determination/MS20260049/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-23 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) | $32.90 | $11.10 | $44.00 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $35.50 | $14.55 | $50.05 |
| POWER EQUIPMENT OPERATOR: CRANE | $35.50 | $14.55 | $50.05 |
| IRONWORKER, REINFORCING | $31.00 | $17.77 | $48.77 |
| PLUMBER (INCLUDES HVAC PIPE AND HVAC UNIT INSTALLATION) | $29.91 | $11.97 | $41.88 |
| PIPEFITTER (EXCLUDES HVAC PIPE AND UNIT INSTALLATION) | $30.41 | $11.47 | $41.88 |
| SPRINKLER FITTER: FIRE SPRINKLER | $32.65 | $23.55 | $56.20 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | $30.45 | $13.88 | $44.33 |
| TRUCK DRIVER: DUMP TRUCK | $14.11 | $0.27 | $14.38 |
| TILE SETTER | $18.00 | $0.00 | $18.00 |
| ROOFER | $14.50 | $0.00 | $14.50 |
| PAINTER (BRUSH AND ROLLER) | $17.00 | $0.00 | $17.00 |
| OPERATOR: BULLDOZER | $15.14 | $1.03 | $16.17 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.89 | $1.62 | $19.51 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $12.50 | $0.00 | $12.50 |
| LABORER: COMMON OR GENERAL | $10.56 | $0.00 | $10.56 |
| IRONWORKER, STRUCTURAL | $18.05 | $0.00 | $18.05 |
| CEMENT MASON/CONCRETE FINISHER | $18.37 | $0.00 | $18.37 |
| CARPENTER, INCLUDES DRYWALL HANGING, FINISHING/TAPING AND FORM WORK | $23.31 | $2.26 | $25.57 |
| BRICKLAYER | $20.29 | $0.00 | $20.29 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.