Residential construction wages: Neshoba, Mississippi
Wage determination MS20260015 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MS20260015 on · latest revision 1 · verify at sam.gov/wage-determination/MS20260015/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $8.65 | $0.00 | $8.65 |
| ROOFER, INCLUDES SHAKE & SHINGLE ROOFS | $10.89 | $0.00 | $10.89 |
| PLUMBER | $11.42 | $0.00 | $11.42 |
| PAINTER | $10.00 | $0.00 | $10.00 |
| OPERATOR: BULLDOZER | $13.13 | $0.00 | $13.13 |
| OPERATOR: BACKHOE | $13.63 | $0.00 | $13.63 |
| LABORER: PIPELAYER | $8.31 | $0.00 | $8.31 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $8.03 | $0.00 | $8.03 |
| LABORER: COMMON OR GENERAL | $7.39 | $0.00 | $7.39 |
| ELECTRICIAN, INCLUDES INSTALLATION OF HVAC/TEMPERATURE CONTROLS | $15.04 | $0.00 | $15.04 |
| DRYWALL HANGER | $11.50 | $0.00 | $11.50 |
| DRYWALL FINISHER/TAPER | $12.50 | $0.00 | $12.50 |
| CEMENT MASON/CONCRETE FINISHER | $10.00 | $0.00 | $10.00 |
| CARPENTER, INCLUDES FORM WORK | $9.60 | $0.00 | $9.60 |
| BRICKLAYER | $18.30 | $0.00 | $18.30 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.