Residential construction wages: Clay, Polk, Houston, Minnesota

Wage determination MN20260024 · Active · Standard · verify on SAM.gov

ClayPolkHouston

Get an email when this determination changes.This determination changed once in the last 12 months, most recently 2026-05-17: 1 rate change (PLUMBER $46.34 → $48.74).
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 22026-05-18diff vs rev 1
rev 12026-05-17diff vs rev 0
rev 02026-01-30original

Current rates (rev 2)

Download CSV

The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
CARPENTER (HOUSTON)$36.71$20.17$56.88
CARPENTER (CLAY, POLK)$31.14$20.69$51.83
ELECTRICIAN (HOUSTON)$40.25$23.32$63.57
ELECTRICIAN (CLAY, POLK)$37.41$18.61$56.02
OPERATOR: POWER EQUIPMENT GROUP 8 OILER. (CLAY, POLK)$26.80$15.85$42.65
OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE. (CLAY, POLK)$29.75$15.85$45.60
OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2. (CLAY, POLK)$31.17$15.85$47.02
OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE (CLAY, POLK)$31.33$15.85$47.18
OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE (CLAY, POLK)$32.98$15.85$48.83
OPERATOR: POWER EQUIPMENT GROUP 8OILER. (HOUSTON)$28.29$15.85$44.14
OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE. (HOUSTON)$31.42$15.85$47.27
OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2.(HOUSTON)$32.93$15.85$48.78
OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE (HOUSTON)$33.10$15.85$48.95
OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE (HOUSTON)$34.85$15.85$50.70
IRONWORKER: STRUCTURAL (CLAY, POLK)$42.89$36.86$79.75
IRONWORKER: STRUCTURAL (HOUSTON)$46.35$36.86$83.21
LABORERS: (3) MASON TENDER (BRICK, CEMENT/CONCRETE) (HOUSTON)$25.42$17.52$42.94
LABORERS: (2) PIPELAYER (HOUSTON)$27.95$17.52$45.47
LABORERS: (1) COMMON OR GENERAL (HOUSTON)$27.25$17.52$44.77
LABORERS GROUP 2 PIPELAYER (CLAY (EXCEPT CITY OF MOORHEAD)) PROJECTS OVER $950,000: $1.75 ADDITIONAL PER HOUR$20.96$14.97$35.93
LABORERS GROUP 1 COMMON OR GENERAL; MASON TENDER (BRICK, CEMENT/CONCRETE) (CLAY (EXCEPT CITY OF MOORHEAD)) PROJECTS OVER $950,000: $1.75 ADDITIONAL PER HOUR$20.21$14.97$35.18
LABORERS: COMMON OR GENERAL LABORER, MASON TENDER (BRICK,CEMENT/CONCRETE), PIPELAYER (CLAY (CITY OF MOORHEAD) COUNTY$18.60$13.44$32.04
LABORERS: COMMON OR GENERAL LABORER, MASON TENDER (BRICK,CEMENT/CONCRETE), PIPELAYER (POLK (CITY OF EAST GRAND FORKS) COUNTY)$20.87$17.39$38.26
LABORER GROUP 2 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects under $760,000)$24.20$21.74$45.94
LABORER GROUP 2 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects $760k and over)$28.47$21.74$50.21
LABORER GROUP 1 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects under $760,000)$23.86$21.74$45.60
LABORER GROUP 1 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects $760k and over)$28.07$21.74$49.81
PAINTER: SPRAY (HOUSTON)$19.00$3.00$22.00
PAINTER: SPRAY (CLAY, POLK)$22.61$8.66$31.27
PLUMBER (HOUSTON)$47.50$30.33$77.83
PLUMBER (CLAY, POLK)$48.74$21.34$70.08
ROOFER (CLAY, POLK)$36.01$16.72$52.73
ROOFER (HOUSTON)$32.71$16.99$49.70
SHEET METAL WORKER (POLK)$35.37$21.12$56.49
SHEET METAL WORKER (CLAY)$35.76$23.17$58.93
SHEET METAL WORKER (HOUSTON)$40.03$28.95$68.98
LABORER: LANDSCAPE$11.50$0.00$11.50

Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.