Residential construction wages: Carlton, St Louis, Minnesota

Wage determination MN20260022 · Active · Standard · verify on SAM.gov

CarltonSt Louis

Get an email when this determination changes.No substantive rate changes here in the last 12 months. The watch exists for the day that changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV

The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
CARPENTER (CARLTON, ST LOUIS (SOUTHERN AREA INCLUDING DULUTH))$31.52$17.64$49.16
PILEDRIVERMAN (ST. LOUIS (REMAINING NORTHERN AREA ))$41.14$27.05$68.19
CARPENTER (ST. LOUIS (REMAINING NORTHERN AREA ))$28.29$22.88$51.17
ELECTRICIAN (CARLTON & ST. LOUIS (SOUTH PART BOUNDED ON THE NORTH BY THE NORTH LINE OF KELSEY TOWNSHIP EXTENDED EAST & WEST))$47.46$33.34$80.80
ELECTRICIANS: (2) ALL OTHER WORK (ST. LOUIS (NORTH PART BOUNDED ON THE SOUTH BY THE SOUTH LINE OF ELLSBURG TOWNSHIP, EXTENDED EAST & WEST))$45.83$32.90$78.73
ELECTRICIANS: (1) UP TO & INCLUDING 6-PLEX UNDER ONE ROOF (ST. LOUIS (NORTH PART BOUNDED ON THE SOUTH BY THE SOUTH LINE OF ELLSBURG TOWNSHIP, EXTENDED EAST & WEST))$39.18$29.69$68.87
OPERATOR: POWER EQUIPMENT GROUP 8 OILER$28.29$15.95$44.24
OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE$31.42$15.95$47.37
OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2$32.93$15.95$48.88
OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE$33.10$15.95$49.05
OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE$34.85$15.95$50.80
IRONWORKER: STRUCTURAL$42.89$36.86$79.75
LABORERS: GROUP 4 MASON TENDER (BRICK, CEMENT/CONCRETE) (CARLTON, ST LOUIS (SOUTH OF T 55 N))$30.62$21.69$52.31
LABORERS: GROUP 3 PIPELAYER (CARLTON, ST LOUIS (SOUTH OF T 55 N))$30.32$21.69$52.01
LABORERS: GROUP 1 COMMON OR GENERAL (CARLTON, ST LOUIS (SOUTH OF T 55 N))$29.92$21.69$51.61
LABORER GROUP 2 PIPELAYER (ST.LOUIS (NORTH OF T 55N))$21.02$14.84$35.86
LABORER GROUP 1 COMMON OR GENERAL, MASON TENDER (BRICK, CEMENT/CONCRETE) (ST.LOUIS (NORTH OF T 55N))$20.62$16.25$36.87
PAINTER (SPRAY)$29.86$16.35$46.21
PLUMBER$52.24$27.56$79.80
ROOFER (CARLTON, ST. LOUIS (SOUTH OF HWY 16, EXCLUDING CITY OF FORBES))$42.12$22.40$64.52
ROOFER (ST. LOUIS (REMAINING NORTHERN TWO-THIRDS))$34.22$16.60$50.82
SHEET METAL WORKER (CARLTON, ST. LOUIS (SOUTHERN ONE-THIRD))$33.36$24.25$57.61
SHEET METAL WORKER (KOOCHICHING & ST. LOUIS (NORTHERN TWO-THIRDS) COUNTIES)$29.85$24.33$54.18
LABORER: LANDSCAPE$11.50$0.00$11.50

Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.