Residential construction wages: Benton, Stearns, Minnesota
Wage determination MN20260021 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MN20260021 on · latest revision 1 · verify at sam.gov/wage-determination/MN20260021/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (WOODFRAME ONLY) | $43.86 | $17.70 | $61.56 |
| CARPENTER (EXCLUDES WOODFRAME) | $36.71 | $20.17 | $56.88 |
| ELECTRICIAN (BENTON EAST OF HWY 25 TO HWY 10 AND AN IMAGINARY LINE STRAIGHT WEST TO THE MISSISSIPPI RIVER & STEARNS) | $52.00 | $32.80 | $84.80 |
| ELECTRICIAN, ELECTRICAL CONTRACTS UNDER $5 MILLION: (BENTON WEST OF HWY 25 TO HWY 10 AND AN IMAGINARY LINE STRAIGHT WEST TO THE MISSISSIPPI RIVER) | $50.00 | $30.86 | $80.86 |
| ELECTRICIAN, ELECTRICAL CONTRACTS $5 MILLION AND OVER: (BENTON WEST OF HWY 25 TO HWY 10 AND AN IMAGINARY LINE STRAIGHT WEST TO THE MISSISSIPPI RIVER) | $50.45 | $31.14 | $81.59 |
| OPERATOR: POWER EQUIPMENT GROUP 8 OILER | $28.29 | $15.95 | $44.24 |
| OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE | $31.42 | $15.95 | $47.37 |
| OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2 | $32.93 | $15.95 | $48.88 |
| OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE | $33.10 | $15.95 | $49.05 |
| OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE | $34.85 | $15.95 | $50.80 |
| IRONWORKER: STRUCTURAL | $46.35 | $36.86 | $83.21 |
| LABORERS: GROUP 2 PIPELAYER PROJECTS OVER $950,000: $1.75 ADDITIONAL PER HOUR | $22.56 | $14.97 | $37.53 |
| LABORERS: GROUP 1 MASON TENDER (BRICK, CEMENT/CONCRETE) PROJECTS OVER $950,000: $1.75 ADDITIONAL PER HOUR | $21.81 | $14.97 | $36.78 |
| PAINTER: SPRAY. PROJECTS UNDER $8,000: RECEIVE 80% OF BASIC HOURLY RATE | $24.91 | $13.31 | $38.22 |
| PLUMBER | $53.16 | $32.21 | $85.37 |
| ROOFER | $42.93 | $22.87 | $65.80 |
| SHEET METAL WORKER | $35.60 | $25.14 | $60.74 |
| LABORER: LANDSCAPE | $11.50 | $0.00 | $11.50 |
| LABORER: COMMON OR GENERAL | $13.26 | $2.81 | $16.07 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.