Residential construction wages: Anoka + 6 more counties, Minnesota
Wage determination MN20260020 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MN20260020 on · latest revision 1 · verify at sam.gov/wage-determination/MN20260020/1
AnokaCarverDakotaRamseyScottWashingtonSherburne
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (ANOKA, CARVER, DAKOTA, RAMSEY, SCOTT, SHERBURNE (EXCLUDING ST. CLOUD & EXTENDING 5 MILES BEYOND THE CITY LIMITS OF ST. CLOUD), WASHINGTON) | $40.63 | $28.42 | $69.05 |
| CARPENTER (SHERBURNE (NW PORTION EXTENDING 5 MILES BEYOND THE CITY LIMITS)) | $40.63 | $28.42 | $69.05 |
| CARPENTER (SHERBURNE (EXTREME NW PORTION, INCLUDING ST. CLOUD & EXTENDING 5 MILES BEYOND THE CITY LIMITS)) | $36.71 | $20.17 | $56.88 |
| ELECTRICIAN (ANOKA (EXCEPT ANOKA & FRIDLEY TOWNSHIPS & THE CITIES OF ANDOVER, ANOKA, COLUMBIA HEIGHTS, COON RAPIDS, FRIDLEY, HILLTOP, RAMSEY & SPRING LAKE PARK), DAKOTA, RAMSEY, SHERBURNE (EAST OF BECKER AND SANTIAGO TWPS), AND WASHINGTON COUNTIES) | $53.91 | $36.48 | $90.39 |
| ELECTRICIAN (ANOKA (ANOKA & FRIDLEY TOWNSHIPS & THE CITIES OF ANDOVER, ANOKA, COLUMBIA HEIGHTS, COON RAPIDS, FRIDLEY, HILLTOP, RAMSEY & SPRING LAKE PARK), CARVER, SCOTT, SHERBURNE (EAST OF HWY 25 TO HWY 10 AND AN IMAGINARY LINE STRAIGHT WEST TO THE MISSISSIPPI RIVER)) | $59.00 | $35.79 | $94.79 |
| ELECTRICIAN: ELECTRICAL CONTRACTS UNDER $5 MILLION: (SHERBURNE (WEST OF STATE HWY 25 TO HWY 10 AND AN IMAGINARY LINE STRAIGHT WEST TO THE MISSSISSIPPI RIVER)) | $43.67 | $22.35 | $66.02 |
| ELECTRICIAN: ELECTRICAL CONTRACTS $5 MILLION AND OVER: (SHERBURNE (WEST OF STATE HWY 25 TO HWY 10 AND AN IMAGINARY LINE STRAIGHT WEST TO THE MISSSISSIPPI RIVER)) | $44.12 | $22.57 | $66.69 |
| OPERATOR: POWER EQUIPMENT GROUP 8 OILER | $28.29 | $15.95 | $44.24 |
| OPERATOR: POWER EQUIPMENT GROUP 7 SELF PROPELLED VIBRATING PACKER | $30.30 | $15.95 | $46.25 |
| OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE | $31.42 | $15.95 | $47.37 |
| OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2 | $32.93 | $15.95 | $48.88 |
| OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE | $33.10 | $15.95 | $49.05 |
| OPERATOR: POWER EQUIPMENT GROUP 3 DRAGLINE | $33.44 | $15.95 | $49.39 |
| OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE | $34.85 | $15.95 | $50.80 |
| IRONWORKER: STRUCTURAL | $46.35 | $36.86 | $83.21 |
| LABORER GROUP 2 BOTTOM PERSON, MASON TENDER (BRICK, CEMENT/CONCRETE), PIPELAYER (DAKOTA, RAMSEY, SCOTT, AND WASHINGTON COUNTIES) | $32.91 | $17.44 | $50.35 |
| LABORER GROUP 1 COMMON OR GENERAL LABORER, ASPHALT RAKER, MASON TENDER (BRICK, CEMENT/CONCRETE), PLASTER TENDER, TOP PERSON (DAKOTA, RAMSEY, SCOTT, AND WASHINGTON COUNTIES) | $32.41 | $17.44 | $49.85 |
| LABORER GROUP 2 BOTTOM PERSON, MASON TENDER (BRICK, CEMENT/CONCRETE), PIPELAYER | $28.96 | $15.82 | $44.78 |
| LABORER GROUP 1 COMMON OR GENERAL LABORER, ASPHALT RAKER, MASON TENDER (BRICK, CEMENT/CONCRETE), PLASTER TENDER, TOP PERSON | $28.46 | $15.82 | $44.28 |
| PAINTER: SPRAY (DAKOTA, RAMSEY, WASHINGTON COUNTIES) | $31.89 | $17.41 | $49.30 |
| PAINTER: SPRAY (ANOKA, CARVER, SCOTT) | $31.45 | $17.85 | $49.30 |
| PAINTER: SPRAY (SHERBURNE (SOUTH AND EAST OF A LINE DRAWN BETWEEN THE TOWN OF SANTIAGO IN SHERBURNE COUNTY AND THE TOWN OF CLEARWATER IN WRIGHT COUNTY)) | $31.45 | $17.85 | $49.30 |
| PAINTER: SPRAY. PROJECTS UNDER $8,000: RECEIVE 80% OF BASIC HOURLY RATE | $24.91 | $13.31 | $38.22 |
| PLUMBER (ANOKA, CARVER, SCOTT & SHERBURNE (EAST OF A LINE RUNNING NORTHEASTERLY FROM THE POINT OF WRIGHT COUNTY THAT LIES FURTHEST NORTH TO THAT PONT OF MILLE LACS COUNTY THAT IS SOUTH BY WEST)) | $59.54 | $33.26 | $92.80 |
| PLUMBER (SHERBURNE (REMAINING WESTERN PORTION)) | $53.16 | $32.21 | $85.37 |
| PLUMBER (DAKOTA, RAMSEY, WASHINGTON) | $50.23 | $37.52 | $87.75 |
| PIPEFITTER (DAKOTA, RAMSEY, WASHINGTON) | $51.70 | $42.45 | $94.15 |
| PIPEFITTER (SHERBURNE COUNTY (WEST OF A LINE RUNNING NORTHEASTERLY FROM THE NORTHERN POINT OF WRIGHT COUNTY TO THE SOUTHWESTERN TIP OF MILLE LACS COUNTY)) | $48.33 | $40.46 | $88.79 |
| PIPEFITTER (ANOKA, CARVER, SCOTT, SHERBURNE (EAST OF A LINE RUNNING NORTHEASTERLY FROM THE POINT OF WRIGHT COUNTY THAT LIES FURTHEST NORTH TO THAT PONT OF MILLE LACS COUNTY THAT IS SOUTH BY WEST)) | $48.33 | $40.46 | $88.79 |
| ROOFER (ANOKA, CARVER, DAKOTA, RAMSEY, SCOTT, WASHINGTON) | $48.32 | $25.54 | $73.86 |
| ROOFER (SHERBURNE) | $39.01 | $21.99 | $61.00 |
| SHEET METAL WORKER (ANOKA, CARVER, DAKOTA, RAMSEY, SCOTT, WASHINGTON) | $45.01 | $26.53 | $71.54 |
| SHEET METAL WORKER (SHERBURNE) | $35.60 | $25.14 | $60.74 |
| LABORER: LANDSCAPE | $11.50 | $0.00 | $11.50 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.