Residential construction wages: Otter Tail, Douglas, Grant, Minnesota
Wage determination MN20260011 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MN20260011 on · latest revision 1 · verify at sam.gov/wage-determination/MN20260011/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | $7.25 | $0.00 | $7.25 |
| SHEET METAL WORKER | $11.66 | $1.32 | $12.98 |
| ROOFER | $7.25 | $0.00 | $7.25 |
| PLUMBER, PIPEFITTER, STEAMFITTER | $8.00 | $0.00 | $8.00 |
| PAINTER | $9.30 | $0.00 | $9.30 |
| LABORER | $7.25 | $0.00 | $7.25 |
| ELECTRICIAN | $10.65 | $1.41 | $12.06 |
| DRYWALL HANGER | $7.25 | $0.00 | $7.25 |
| DRYWALL FINISHER/TAPER | $7.25 | $0.00 | $7.25 |
| CEMENT MASON/FINISHER | $7.51 | $0.00 | $7.51 |
| CARPENTER | $8.16 | $0.00 | $8.16 |
| BRICKLAYER/BLOCKLAYER | $8.65 | $0.00 | $8.65 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.