Residential construction wages: McLeod, Sibley, Minnesota
Wage determination MN20260008 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MN20260008 on · latest revision 1 · verify at sam.gov/wage-determination/MN20260008/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS WHETHER THEY CONTAIN ASBESTOS OR NOT) | $55.34 | $34.03 | $89.37 |
| BOILERMAKER | $48.00 | $31.14 | $79.14 |
| BRICKLAYER: BRICKLAYER, BLOCKLAYER, CAULKER, CLEANER, POINTER, STONEMASON (SIBLEY COUNTY) | $45.11 | $25.61 | $70.72 |
| MARBLE SETTER | $45.47 | $26.33 | $71.80 |
| BRICKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON (MCLEOD COUNTY) | $45.11 | $25.61 | $70.72 |
| TILE LAYER (SIBLEY COUNTY) | $34.92 | $21.81 | $56.73 |
| TILE LAYER (MCLEOD COUNTY) | $39.17 | $10.16 | $49.33 |
| TILE FINISHER | $28.50 | $8.20 | $36.70 |
| TERRAZZO WORKER/SETTER (MECHANIC) | $44.36 | $22.35 | $66.71 |
| TERRAZZO WORKER/SETTER (FINISHER) | $42.67 | $22.04 | $64.71 |
| TERRAZZO WORKER/SETTER (BASE MACHINE) | $40.60 | $21.94 | $62.54 |
| LATHER | $39.55 | $28.63 | $68.18 |
| SOFT FLOOR LAYER (MCLEOD (E. PART, INCLUDING WINSTED, SILVER LAKE, LESTER PRAIRIE, PLATO & GLENCOE) & SIBLEY (NE PART, INCLUDING GREEN ISLE)) | $39.03 | $25.00 | $64.03 |
| MILLWRIGHT | $42.95 | $36.81 | $79.76 |
| CARPENTER: WOOD FRAME CONSTRUCTION (MCLEOD) | $36.71 | $20.17 | $56.88 |
| CARPENTER (MCLEOD) | $36.71 | $20.17 | $56.88 |
| CARPENTER & PILEDRIVERMEN (SIBLEY COUNTY (EASTERN 1/3)) | $36.71 | $20.17 | $56.88 |
| CARPENTER & PILEDRIVERMEN (SIBLEY COUNTY (WESTERN 2/3 INCLUDING GREEN ISLE, NEW AUBURN, AND GAYLORD)) | $36.71 | $20.17 | $56.88 |
| ELECTRICIAN ELECTRICAL CONTRACTS UNDER $5MILLION (MCLEOD COUNTY) CABLE SPLICER = $1.00 ADDITIONAL PER HOUR | $43.67 | $22.35 | $66.02 |
| ELECTRICIAN ELECTRICAL CONTRACTS $ 5 MILLION AND OVER (MCLEOD COUNTY) CABLE SPLICER = $1.00 ADDITIONAL PER HOUR | $44.12 | $22.57 | $66.69 |
| ELECTRICIAN (SIBLEY COUNTY) | $40.25 | $23.32 | $63.57 |
| ELEVATOR MECHANIC A.PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY | $62.52 | $38.44 | $100.96 |
| POWER EQUIPMENT OPERATOR GROUP 8 MECHANICAL SPACE HEATER (TEMPORARY HEAT); OILER OR GREASER; & ELEVATOR | $28.29 | $15.95 | $44.24 |
| POWER EQUIPMENT OPERATOR GROUP 7 AIR COMPRESSOR 600 CFM OR OVER; PUMP AND/OR CONVEYOR; BRAKEMAN; PICK-UP SWEEPER (1 CU. YD. & OVER HOPPER CAPACITY); TRUCK CRANE OILER; & WELDING MACHINE, FIREMAN TEMPORARY HEAT | $30.30 | $15.95 | $46.25 |
| POWER EQUIPMENT OPERATOR GROUP 6 CONCRETE BATCH PLANT; GUNITE; TRACTOR D2 OR SIMILAR SIZE; & FRONT END LOADER, UP TO 1 CU. YD | $31.42 | $15.95 | $47.37 |
| POWER EQUIPMENT OPERATOR GROUP 5 AIR COMPRESSOR 450 CFM OR OVER (2 OR MORE MACHINES); PUMP AND/OR CONVEYOR (2 OR MORE MACHINES); MECHANIC; PUMPCRETE OR COMPLACO TYPE MACHINE; FORKLIFT; BOOM TRUCK UP TO 100 FT.; CONCRETE MIXER; DRILL RIG - HEAVY ROTARY OR CHURN WHEN USED FOR CAISSON DRILLING FOR ELEVATOR CYLINDER OR BUILDING CONSTRUCTION; FRONT END LOADER (OVER 1 CU. YD.); HOIST ENGINEER (1 OR 2 DRUMS); STRADDLE CARRIER; POWER PLANT ENGINEER (100 KW & OVER ON MULTIPLES EQUAL TO 100KW & OVER); TRACTOR OVER D2; & WELL POINT PUMP | $32.93 | $15.95 | $48.88 |
| POWER EQUIPMENT OPERATOR GROUP 4 CRAWLER BACKHOE; HOIST ENGINEER (3 DRUMS OR MORE); LOCOMOTIVE OPERATOR; OVERHEAD CRANE OPERATOR (INSIDE BUILDING PERIMETER); & TRACTOR OPERATOR WITH BOOM | $33.10 | $15.95 | $49.05 |
| POWER EQUIPMENT OPERATOR GROUP 3 TRAVELING TOWER CRANE; MASTER MECHANIC; PILE DRIVING (WHEN 3 DRUMS ARE USED); TRUCK & CRAWLER CRANE, UP TO BUT NOT INCLUDING 150' OF BOOM, INCLUDING JIB; DERRICK (GUY & STIFFLEG); TOWER CRANE (STATIONARY) UP TO 200'; & ALL TERRAIN VEHICLE CRANE, BOOM TRUCK OVER 100 FT | $33.44 | $15.95 | $49.39 |
| POWER EQUIPMENT OPERATOR GROUP 2 TRUCK & CRAWLER CRANE WITH 150' OF BOOM, UP TO BUT NOT INCLUDING 200' OF BOOM, INCLUDING JIB; & TOWER CRANE 200' & OVER, CONCRETE PUMP 164 FT BOOM | $34.85 | $15.95 | $50.80 |
| POWER EQUIPMENT OPERATOR GROUP 1 HELICOPTER; TRUCK & CRAWLER CRANE WITH 200' OF BOOM & OVER, INCLUDING JIB ($.50 PREMIUM WITH 300' OF BOOM & OVER, INCLUDING JIB); & TOWER CRANE 250' & OVER | $35.19 | $15.95 | $51.14 |
| IRONWORKER | $43.00 | $34.11 | $77.11 |
| LANDSCAPER: SEEDING, SODDING , PLANTING OF EVERGREEN & DECIDUOUS SHRUBS & TREES ON ALL WORK, EXCEPT RESIDENTIAL OF 4 UNITS OR LESS (MCLEOD COUNTY) | $16.26 | $9.68 | $25.94 |
| LABORERS: PROJECTS UNDER $1,000,000: GROUP 4 FLAGPERSON (MCLEOD COUNTY) | $19.17 | $15.79 | $34.96 |
| LABORERS: PROJECTS UNDER $1,000,000: GROUP 3 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTER OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTAR, SILENT DYNAMITE, ETC. (MCLEOD COUNTY) | $21.88 | $15.79 | $37.67 |
| LABORERS: PROJECTS UNDER $1,000,000: GROUP 2 CAISSON WORK; MASON TENDER; MOUNTED WALL SAW OPERATOR; NOZZLE OPERATOR - GUNITE, CEMENT, SANDBLASTING; PIPELAYER; PIPE RE-HABTECH; REFRACTORY WORKER; SHEETING SETTER & DRIVER, HEAVY BUILDING EXCAVATION; UNDERGROUND WORK-OPEN DITCH OR COUNTY) | $21.97 | $15.79 | $37.76 |
| LABORERS: PROJECTS UNDER $1,000,000: GROUP 1 CONSTRUCTION; CARPENTER TENDER; CONCRETE; DAMP PROOFER BELOW GRADE; DUMPMAN - DIRT, ASPHALT, CONCRETE, CEMENT; HEATER TENDER; HOT TAR CAULKER - CORKER; JOIST HANDLER; MATERIAL HANDLER - POWER BUGGY; REBAR; SNOW BLOWER OPERATOR; SIGNALPERSON; CHAIN SAW OPERATOR; CONCRETE SAW, DRILL OPERATOR; CONCRETE VIBRATOR; DEMOLITION & WRECKING EXCLUDING REMODELING; DRILL RUNNER TENDER; MORTAR MIXER - CEMENT OR ANY OTHER SUBSTITUTE MATERIAL OR COMPOSITION; PIPE HANDLER; PNEUMATIC & ELECTRIC TOOL, JACKHAMMER, PAVING BUSTER, CHIPPING HAMMER, TAMPER OPERATOR, ETC.; SWING STAGE LINE SCAFFOLD (NOT INCLUDING "PATENT" SCAFFOLDING); & TORCHMAN-GAS, ELECTRIC, THERMAL OR SIMILAR DEVICE (MCLEOD COUNTY) | $21.17 | $15.79 | $36.96 |
| LABORERS: PROJECTS $1,000,000 & OVER: GROUP 4 FLAGPERSON (MCLEOD COUNTY) | $20.84 | $16.57 | $37.41 |
| LABORERS: PROJECTS $1,000,000 & OVER: GROUP 3 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTER OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTAR, SILENT DYNAMITE, ETC. (MCLEOD COUNTY) | $23.54 | $16.57 | $40.11 |
| LABORERS: PROJECTS $1,000,000 & OVER: GROUP 2 CAISSON WORK; MASON TENDER; MOUNTED WALL SAW OPERATOR; NOZZLE OPERATOR - GUNITE, CEMENT, SANDBLASTING; PIPELAYER; PIPE RE-HABTECH; REFRACTORY WORKER; SHEETING SETTER & DRIVER, HEAVY BUILDING EXCAVATION; UNDERGROUND WORK-OPEN DITCH OR COUNTY) | $23.64 | $16.57 | $40.21 |
| LABORERS: PROJECTS $1,000,000 & OVER: GROUP 1 CONSTRUCTION; CARPENTER TENDER; CONCRETE; DAMP PROOFER BELOW GRADE; DUMPMAN - DIRT, ASPHALT, CONCRETE, CEMENT; HEATER TENDER; HOT TAR CAULKER - CORKER; JOIST HANDLER; MATERIAL HANDLER - POWER BUGGY; REBAR; SNOW BLOWER OPERATOR; SIGNALPERSON; CHAIN SAW OPERATOR; CONCRETE SAW, DRILL OPERATOR; CONCRETE VIBRATOR; DEMOLITION & WRECKING EXCLUDING REMODELING; DRILL RUNNER TENDER; MORTAR MIXER - CEMENT OR ANY OTHER SUBSTITUTE MATERIAL OR COMPOSITION; PIPE HANDLER; PNEUMATIC & ELECTRIC TOOL, JACKHAMMER, PAVING BUSTER, CHIPPING HAMMER, TAMPER OPERATOR, ETC.; SWING STAGE LINE SCAFFOLD (NOT INCLUDING "PATENT" SCAFFOLDING); & TORCHMAN-GAS, ELECTRIC, THERMAL OR SIMILAR DEVICE (MCLEOD COUNTY) | $22.84 | $16.57 | $39.41 |
| LABORER (ASBESTOS ABATEMENT) | $30.83 | $17.61 | $48.44 |
| PLASTER TENDER | $21.97 | $15.79 | $37.76 |
| LANDSCAPER: SEEDING, SODDING , PLANTING OF EVERGREEN & DECIDUOUS SHRUBS & TREES ON ALL WORK, EXCEPT RESIDENTIAL OF 4 UNITS OR LESS (SIBLEY COUNTY) | $28.25 | $16.20 | $44.45 |
| LABORERS: PROJECTS UNDER $1,000,000: GROUP 4 FLAGPERSON (SIBLEY COUNTY) | $16.35 | $13.94 | $30.29 |
| LABORERS: PROJECTS UNDER $1,000,000: GROUP 3 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTER OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTAR, SILENT DYNAMITE, ETC. (SIBLEY COUNTY) | $19.06 | $13.94 | $33.00 |
| LABORERS: PROJECTS UNDER $1,000,000: GROUP 2 CAISSON WORK; MASON TENDER; MOUNTED WALL SAW OPERATOR; NOZZLE OPERATOR - GUNITE, CEMENT, SANDBLASTING; PIPELAYER; PIPE RE-HABTECH; REFRACTORY WORKER; SHEETING SETTER & DRIVER, HEAVY BUILDING EXCAVATION; UNDERGROUND WORK-OPEN DITCH OR (SIBLEY COUNTY) | $19.15 | $13.94 | $33.09 |
| LABORERS: PROJECTS UNDER $1,000,000: GROUP 1 CONSTRUCTION; CARPENTER TENDER; CONCRETE; DAMP PROOFER BELOW GRADE; DUMPMAN - DIRT, ASPHALT, CONCRETE, CEMENT; HEATER TENDER; HOT TAR CAULKER - CORKER; JOIST HANDLER; MATERIAL HANDLER - POWER BUGGY; REBAR; SNOW BLOWER OPERATOR; SIGNALPERSON; CHAIN SAW OPERATOR; CONCRETE SAW, DRILL OPERATOR; CONCRETE VIBRATOR; DEMOLITION & WRECKING EXCLUDING REMODELING; DRILL RUNNER TENDER; MORTAR MIXER - CEMENT OR ANY OTHER SUBSTITUTE MATERIAL OR COMPOSITION; PIPE HANDLER; PNEUMATIC & ELECTRIC TOOL, JACKHAMMER, PAVING BUSTER, CHIPPING HAMMER, TAMPER OPERATOR, ETC.; SWING STAGE LINE SCAFFOLD (NOT INCLUDING "PATENT" SCAFFOLDING); & TORCHMAN-GAS, ELECTRIC, THERMAL OR SIMILAR DEVICE (SIBLEY COUNTY) | $18.35 | $13.94 | $32.29 |
| LABORERS: PROJECTS $1,000,000 & OVER: GROUP 4 FLAGPERSON (SIBLEY COUNTY) | $18.04 | $14.70 | $32.74 |
| LABORERS: PROJECTS $1,000,000 & OVER: GROUP 3 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTER OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTAR, SILENT DYNAMITE, ETC. (SIBLEY COUNTY) | $20.74 | $14.70 | $35.44 |
| LABORERS: PROJECTS $1,000,000 & OVER: GROUP 2 CAISSON WORK; MASON TENDER; MOUNTED WALL SAW OPERATOR; NOZZLE OPERATOR - GUNITE, CEMENT, SANDBLASTING; PIPELAYER; PIPE RE-HABTECH; REFRACTORY WORKER; SHEETING SETTER & DRIVER, HEAVY BUILDING EXCAVATION; UNDERGROUND WORK-OPEN DITCH OR COUNTY) | $20.84 | $14.70 | $35.54 |
| LABORERS: PROJECTS $1,000,000 & OVER: GROUP 1 CONSTRUCTION; CARPENTER TENDER; CONCRETE; DAMP PROOFER BELOW GRADE; DUMPMAN - DIRT, ASPHALT, CONCRETE, CEMENT; HEATER TENDER; HOT TAR CAULKER - CORKER; JOIST HANDLER; MATERIAL HANDLER - POWER BUGGY; REBAR; SNOW BLOWER OPERATOR; SIGNALPERSON; CHAIN SAW OPERATOR; CONCRETE SAW, DRILL OPERATOR; CONCRETE VIBRATOR; DEMOLITION & WRECKING EXCLUDING REMODELING; DRILL RUNNER TENDER; MORTAR MIXER - CEMENT OR ANY OTHER SUBSTITUTE MATERIAL OR COMPOSITION; PIPE HANDLER; PNEUMATIC & ELECTRIC TOOL, JACKHAMMER, PAVING BUSTER, CHIPPING HAMMER, TAMPER OPERATOR, ETC.; SWING STAGE LINE SCAFFOLD (NOT INCLUDING "PATENT" SCAFFOLDING); & TORCHMAN-GAS, ELECTRIC, THERMAL OR SIMILAR DEVICE (SIBLEY COUNTY) | $20.04 | $14.70 | $34.74 |
| PAINTERS: SPRAY; STEEL; SANDBLASTER; SWING STAGE & EPOXY (MCLEOD) | $31.45 | $17.85 | $49.30 |
| PAINTERS: BRUSH; ROLLER; & WALLPAPER HANGER (MCLEOD) | $31.45 | $17.85 | $49.30 |
| DRYWALL: SANDER (MCLEOD) | $22.63 | $18.67 | $41.30 |
| DRYWALL: FINISHER (MCLEOD) | $30.17 | $18.67 | $48.84 |
| DRYWALL TAPER/FINISHER (SIBLEY COUNTY) | $19.00 | $25.79 | $44.79 |
| PAINTERS: 4 STORIES: BRUSH & ROLLER (SIBLEY COUNTY) $0.50 PER HOUR ADDITIONAL APPLICATION OF EPOXY, CREOSOTE, OTHER TOXIC MATERIALS - $0.25 PER HOUR ADDITIONAL | $35.28 | $25.49 | $60.77 |
| PAINTERS: 1 TO 3 STORIES: BRUSH & ROLLER (SIBLEY COUNTY) PAPERHANGER - $0.25 PER HOUR ADDITIONAL. EPOXY, CREOSOTE, OTHER TOXIC MATERIALS - $0.25 PER HOUR ADDITIONAL | $19.00 | $3.00 | $22.00 |
| GLAZIER | $50.98 | $27.35 | $78.33 |
| PLASTERER | $42.52 | $30.37 | $72.89 |
| CEMENT MASON/CONCRETE FINISHER | $46.46 | $23.47 | $69.93 |
| PLUMBER (MCLEOD) | $59.54 | $33.26 | $92.80 |
| PLUMBER: INCLUDES GAS FITTERS | $36.78 | $34.51 | $71.29 |
| PIPEFITTER (SIBLEY COUNTY) | $37.05 | $30.27 | $67.32 |
| PIPEFITTER (MCLEOD) | $48.33 | $40.46 | $88.79 |
| ROOFER | $48.32 | $25.54 | $73.86 |
| SPRINKLER FITTER | $42.94 | $27.26 | $70.20 |
| SHEET METAL WORKER | $45.01 | $26.53 | $71.54 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.