Residential construction wages: Blue Earth + 14 more counties, Minnesota
Wage determination MN20260001 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MN20260001 on · latest revision 1 · verify at sam.gov/wage-determination/MN20260001/1
Blue EarthBrownFaribaultFillmoreFreebornGoodhueLe SueurMartinMowerNicolletRiceSteeleWasecaWatonwanWinona
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | $8.80 | $0.00 | $8.80 |
| SHEET METAL WORKER | $10.14 | $1.82 | $11.96 |
| POWER EQUIPMENT OPERATOR (BULLDOZER) | $12.96 | $0.00 | $12.96 |
| POWER EQUIPMENT OPERATOR (BACKHOE) | $12.68 | $0.00 | $12.68 |
| PLUMBER (INCLUDES HVAC WORK) | $13.26 | $2.44 | $15.70 |
| PIPEFITTER (DOES NOT INCLUDE HVAC WORK) | $14.58 | $4.67 | $19.25 |
| PAINTER | $14.00 | $2.44 | $16.44 |
| LABORERS: MASON TENDER | $8.50 | $0.00 | $8.50 |
| LABORERS: (COMMON) | $7.86 | $0.00 | $7.86 |
| ELECTRICIAN | $14.05 | $4.23 | $18.28 |
| DRYWALL TAPER | $10.69 | $0.00 | $10.69 |
| CEMENT MASON/CONCRETE FINISHER | $11.00 | $0.00 | $11.00 |
| CARPENTER | $12.18 | $1.10 | $13.28 |
| BRICKLAYER | $11.00 | $0.00 | $11.00 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.