MI20260090: rev 1 → rev 2
6 rate changes.
Rate changes
Rates below include fringe (the full hourly package). Enter your remaining crew hours per classification to price this change for a job.
| Classification | Old total | New total | Δ/hr | Hours on job | Cost impact |
|---|---|---|---|---|---|
| PLUMBER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION (TOWNSHIP OF BRIGHTON) | $76.26 | $82.55 | +6.29 | — | |
| PLUMBER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION (TOWNSHIPS OF GREEN OAK & HAMBURG) | $77.17 | $79.22 | +2.05 | — | |
| PIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION; INCLUDING HVAC SYSTEM INSTALLATION (TOWNSHIPS OF GREEN OAK & HAMBURG) | $77.17 | $79.22 | +2.05 | — | |
| PLUMBER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION | $71.72 | $72.79 | +1.07 | — | |
| PIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION; INCLUDING HVAC SYSTEM INSTALLATION | $71.72 | $72.79 | +1.07 | — | |
| PIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION; INCLUDING HVAC SYSTEM INSTALLATION (TOWNSHIP OF BRIGHTON) | $79.10 | $89.86 | +10.76 | — |