MI20260001: rev 1 → rev 2

5 rate changes, 29 added, 59 removed.

Rate changes

Rates below include fringe (the full hourly package). Enter your remaining crew hours per classification to price this change for a job.

ClassificationOld totalNew totalΔ/hrHours on jobCost impact
LINE CONSTRUCTION: GROUNDMAN/DRIVER$40.72$51.72+11.00
LINE CONSTRUCTION: JOURNEYMAN SIGNAL TECH, COMMUNICATIONS TECH, TOWER TECH & FIBER OPTIC SPLICERS$56.66$72.92+16.26
LINE CONSTRUCTION: JOURNEYMAN SPECIALIST JOURNEYMAN SPECIALIST: REFERS TO A CREW OF ONLY ONE PERSON WORKING ALONE$64.05$82.74+18.69
LINE CONSTRUCTION: OPERATOR A OPERATOR A: SHALL BE PROFICIENT IN OPERATING ALL POWER EQUIPMENT INCLUDING: BACKHOE, EXCAVATOR, DIRECTIONAL BORE AND BOOM/DIGGER TRUCK$49.11$62.87+13.76
LINE CONSTRUCTION: OPERATOR B OPERATOR B: SHALL BE PROFICIENT IN OPERATING ANY 2 OF THE ABOVE MENTIONED PIECES OF EQUIPMENT LISTED UNDER OPERATOR A$46.38$59.24+12.86

Added classifications

OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 6 (AREA 2)$35.78$28.25
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 6 (AREA 1)$35.78$28.25
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 5 (AREA 2)$32.29$15.40
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 5 (AREA 1)$32.29$15.40
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 4 (AREA 2)$46.77$28.25
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 4 (AREA 1)$46.77$28.25
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3 (AREA 2)$50.61$28.25
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3 (AREA 1)$50.61$28.25
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2 (AREA 2)$52.15$28.25
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2 (AREA 1)$52.15$28.25
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1 (AREA 2)$55.02$28.25
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1 (AREA 1)$55.02$28.25
OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 5 (AREA 2)$30.35$12.10
OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 5 (AREA 1)$30.35$12.10
OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 4 (AREA 2)$39.95$25.25
OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 4 (AREA 1)$39.95$25.25
OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 3 (AREA 2)$40.52$25.25
OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 3 (AREA 1)$40.52$25.25
OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 2 (AREA 2)$41.25$25.25
OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 2 (AREA 1)$41.25$25.25
OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 1 (AREA 2)$45.98$25.25
OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 1 (AREA 1)$45.98$25.25
LABORERS - OPEN CUT: GROUP 1 CONSTRUCTION LABORER (ZONE 1 - MACOMB, OAKLAND AND WAYNE COUNTIES) SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK$29.98$22.75
LABORERS - OPEN CUT: GROUP 1 CONSTRUCTION LABORER (ZONE 5 - ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK$29.98$22.75
TRUCK DRIVER TRUCKS, 8 CU. YDS. AND OVER (AREA 2)$33.50$0.75
TRUCK DRIVER TRUCKS, 8 CU. YDS. AND OVER (AREA 1)$33.40$0.75
TRUCK DRIVER TRUCKS UNDER 8 CU. YDS. (AREA 2)$33.50$0.75
TRUCK DRIVER TRUCKS UNDER 8 CU. YDS. (AREA 1)$33.40$0.75
TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 1 (AREA 2)$24.12$19.04

Removed classifications

OPERATOR: Power Equipment (Steel Erection) - AREA 1 GROUP 1was $55.02
OPERATOR: Power Equipment (Steel Erection) - GROUP 2was $52.15
OPERATOR: Power Equipment (Steel Erection) - GROUP 3was $50.61
OPERATOR: Power Equipment (Steel Erection) - GROUP 4was $46.77
OPERATOR: Power Equipment (Steel Erection) - GROUP 5was $32.29
OPERATOR: Power Equipment (Steel Erection) - GROUP 6was $35.78
OPERATOR: Power Equipment (Steel Erection) - AREA 2 GROUP 1was $55.02
OPERATOR: Power Equipment (Underground construction (including sewer)) - AREA 1: GROUP 1was $45.98
OPERATOR: Power Equipment (Underground construction (including sewer)) - GROUP 2was $41.25
OPERATOR: Power Equipment (Underground construction (including sewer)) - GROUP 3was $40.52
OPERATOR: Power Equipment (Underground construction (including sewer)) - GROUP 4was $39.95
OPERATOR: Power Equipment (Underground construction (including sewer)) - GROUP 5was $30.35
OPERATOR: Power Equipment (Underground construction (including sewer)) - AREA 2: GROUP 1was $45.98
IRONWORKER - Pre-engineered metal buildingswas $23.59
Laborers - hazardous waste abatement: (ALCONA, ALPENA, ANTRIM, BENZIE, CHARLEVOIX, CHEBOYGAN, CRAWFORD, EMMET, GRAND TRAVERSE, IOSCO, KALKASKA, LEELANAU, MISSAUKEE, MONTMORENCY, OSCODA, OTSEGO, PRESQUE ISLE AND WEXFORD COUNTIES - Zone 10) - Levels A, B or Cwas $17.45
Laborers - hazardous waste abatement: (ALCONA, ALPENA, ANTRIM, BENZIE, CHARLEVOIX, CHEBOYGAN, CRAWFORD, EMMET, GRAND TRAVERSE, IOSCO, KALKASKA, LEELANAU, MISSAUKEE, MONTMORENCY, OSCODA, OTSEGO, PRESQUE ISLE AND WEXFORD COUNTIES - Zone 10) - Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level Dwas $16.45
Laborers - hazardous waste abatement: (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES - Zone 11) - Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level Dwas $22.58
Laborers - hazardous waste abatement: (ARENAC, BAY, CLARE, GLADWIN, GRATIOT, HURON, ISABELLA, MIDLAND, OGEMAW, ROSCOMMON, SAGINAW AND TUSCOLA COUNTIES - Zone 8) - Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level Dwas $20.80
Laborers - hazardous waste abatement: (CLINTON, EATON AND INGHAM COUNTIES; IONIA COUNTY (City of Portland); LIVINGSTON COUNTY (west of Oak Grove Rd., including the City of Howell) - Zone 6) - Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level Dwas $24.64
Laborers - hazardous waste abatement: (HILLSDALE, JACKSON AND LENAWEE COUNTIES - Zone 4) - Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level Dwas $24.17
Laborers - hazardous waste abatement: (SANILAC AND ST. CLAIR COUNTIES - Zone 5) - Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level Dwas $24.75
Laborers - tunnel, shaft and caisson - GROUP 4was $23.97
Laborers - tunnel, shaft and caisson - GROUP 5was $24.22
Laborers - tunnel, shaft and caisson - GROUP 6was $24.55
Laborers - tunnel, shaft and caisson - GROUP 7was $17.83
Laborers - tunnel, shaft and caisson - GROUP 4was $29.57
Laborers - tunnel, shaft and caisson - GROUP 5was $25.76
Laborers - tunnel, shaft and caisson - GROUP 6was $26.07
Laborers - tunnel, shaft and caisson - GROUP 7was $25.57
Laborers - open cut - ZONE 1 - MACOMB, OAKLAND AND WAYNE COUNTIES: GROUP 1was $29.98
Laborers - open cut - GROUP 4was $23.71
Laborers - open cut - GROUP 5was $24.17
Laborers - open cut - GROUP 6was $22.00
Laborers - open cut - GROUP 7was $17.84
Laborers - open cut - GROUP 4was $25.10
Laborers - open cut - GROUP 5was $25.25
Laborers - open cut - GROUP 6was $22.55
Laborers - open cut - GROUP 7was $22.11
Laborers - open cut - GROUP 4was $23.30
Laborers - open cut - GROUP 5was $23.44
Laborers - open cut - GROUP 6was $20.74
Laborers - open cut - GROUP 7was $22.23
Laborers - open cut - GROUP 4was $22.33
Laborers - open cut - GROUP 5was $22.45
Laborers - open cut - GROUP 6was $19.67
Laborers - open cut - GROUP 7was $22.30
Laborers - open cut - ZONE 5 - ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES: GROUP 1was $29.98
Laborers - open cut - GROUP 4was $22.56
Laborers - open cut - GROUP 5was $22.64
Laborers - open cut - GROUP 6was $19.99
Laborers - open cut - GROUP 7was $22.45
TRUCK DRIVER - Trucks under 8 cu. ydswas $33.40
TRUCK DRIVER - Trucks, 8 cu. yds. and overwas $33.40
TRUCK DRIVER - Trucks under 8 cu. ydswas $33.50
TRUCK DRIVER - Trucks, 8 cu. yds. and overwas $33.50
Sign Installer - GROUP 2was $25.27
Sign Installer - GROUP 2was $25.02
awas $132.70
TRUCK DRIVER (Underground construction) - AREA 2 GROUP 1was $24.12