Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GRADER/BLADE, MECHANIC, PAVER (ASPHALT, AGGREGATE, AND CONCRETE), ROLLER ASPHALT | $30.17 | $13.80 | $43.97 |
| TRUCK DRIVER: DUMP TRUCK | $14.56 | $6.32 | $20.88 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.02 | $5.37 | $22.39 |
| TRAFFIC CONTROL: FLAGGER | $9.00 | $0.00 | $9.00 |
| OPERATOR: ROLLER (EARTH) | $17.61 | $2.97 | $20.58 |
| OPERATOR: MILLING MACHINE | $26.83 | $7.05 | $33.88 |
| OPERATOR: LOADER | $18.94 | $7.66 | $26.60 |
| OPERATOR: BULLDOZER | $21.71 | $5.67 | $27.38 |
| OPERATOR: BROOM/SWEEPER | $18.77 | $0.00 | $18.77 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $19.26 | $5.57 | $24.83 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.33 | $2.78 | $19.11 |
| LABORER: LANDSCAPE | $17.03 | $2.81 | $19.84 |
| LABORER: COMMON OR GENERAL | $12.83 | $2.20 | $15.03 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $17.08 | $2.48 | $19.56 |
| IRONWORKER, STRUCTURAL | $22.33 | $4.50 | $26.83 |
| IRONWORKER, REINFORCING | $21.85 | $0.00 | $21.85 |
| ELECTRICIAN | $25.78 | $6.83 | $32.61 |
| CEMENT MASON/CONCRETE FINISHER | $19.27 | $1.13 | $20.40 |
| CARPENTER, INCLUDES FORM WORK | $18.95 | $3.23 | $22.18 |
| TRUCK DRIVER: VACUUM TRUCK | $25.65 | $17.69 | $43.34 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.