Highway construction wages: Penobscot, Maine
Wage determination ME20260047 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/ME20260047 on July 24, 2026 · latest revision 2 · verify at sam.gov/wage-determination/ME20260047/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-23 | original |
Current rates (rev 2)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GRADER/BLADE, MECHANIC, PAVER (ASPHALT, AGGREGATE, AND CONCRETE), ROLLER ASPHALT | $30.17 | $13.80 | $43.97 |
| TRUCK DRIVER: DUMP TRUCK | $14.56 | $6.32 | $20.88 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.02 | $5.37 | $22.39 |
| TRAFFIC CONTROL: FLAGGER | $9.00 | $0.00 | $9.00 |
| OPERATOR: ROLLER (EARTH) | $17.61 | $2.97 | $20.58 |
| OPERATOR: MILLING MACHINE | $26.83 | $7.05 | $33.88 |
| OPERATOR: LOADER | $18.94 | $7.66 | $26.60 |
| OPERATOR: BULLDOZER | $21.71 | $5.67 | $27.38 |
| OPERATOR: BROOM/SWEEPER | $18.77 | $0.00 | $18.77 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $19.26 | $5.57 | $24.83 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.33 | $2.78 | $19.11 |
| LABORER: LANDSCAPE | $17.03 | $2.81 | $19.84 |
| LABORER: COMMON OR GENERAL | $12.83 | $2.20 | $15.03 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $17.08 | $2.48 | $19.56 |
| IRONWORKER, STRUCTURAL | $22.33 | $4.50 | $26.83 |
| IRONWORKER, REINFORCING | $21.85 | $0.00 | $21.85 |
| ELECTRICIAN | $25.78 | $6.83 | $32.61 |
| CEMENT MASON/CONCRETE FINISHER | $19.27 | $1.13 | $20.40 |
| CARPENTER, INCLUDES FORM WORK | $18.95 | $3.23 | $22.18 |
| TRUCK DRIVER: VACUUM TRUCK | $25.65 | $17.69 | $43.34 |