Highway construction wages: Aroostook, Maine
Wage determination ME20260034 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/ME20260034 on · latest revision 1 · verify at sam.gov/wage-determination/ME20260034/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GRADER/BLADE, MILLING MACHINE, PAVER (ASPHALT, AGGREGATE, AND CONCRETE), ROLLER ASPHALT | $30.17 | $13.80 | $43.97 |
| TRUCK DRIVER: TACKTRUCK | $18.82 | $8.29 | $27.11 |
| TRUCK DRIVER: DUMP TRUCK | $14.40 | $7.04 | $21.44 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.48 | $5.37 | $22.85 |
| TRAFFIC CONTROL: FLAGGER | $9.00 | $0.00 | $9.00 |
| OPERATOR: ROLLER (EARTH) | $15.55 | $5.83 | $21.38 |
| OPERATOR: SCREED | $18.82 | $4.75 | $23.57 |
| OPERATOR: MECHANIC | $22.30 | $8.71 | $31.01 |
| OPERATOR: LOADER | $16.21 | $3.23 | $19.44 |
| OPERATOR: BULLDOZER | $16.58 | $2.89 | $19.47 |
| OPERATOR: BROOM/SWEEPER | $16.52 | $6.38 | $22.90 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.36 | $5.06 | $25.42 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.63 | $2.28 | $19.91 |
| LABORER: WHEELMAN | $15.40 | $3.01 | $18.41 |
| LABORER: COMMON OR GENERAL | $13.23 | $1.22 | $14.45 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $14.32 | $3.17 | $17.49 |
| IRONWORKER, REINFORCING | $16.27 | $0.00 | $16.27 |
| HIGHWAY/PARKING LOT STRIPING: LABORER | $14.29 | $1.89 | $16.18 |
| CARPENTER, INCLUDES FORM WORK | $18.34 | $2.84 | $21.18 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.