Residential construction wages: Queen Anne's, Maryland

Wage determination MD20260067 · Active · Standard · verify on SAM.gov

Queen Anne's

Get an email when this determination changes.No substantive rate changes here in the last 12 months. The watch exists for the day that changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV

The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
SOFT FLOOR LAYER (CARPET)$34.12$14.64$48.76
SPRINKLER FITTER (FIRE SPRINKLERS)$26.06$6.52$32.58
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$18.82$1.20$20.02
ROOFER$26.80$0.00$26.80
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION$20.48$0.00$20.48
PLUMBER (HVAC PIPE INSTALLATION ONLY)$17.60$0.00$17.60
PAINTER (BRUSH AND ROLLER), EXCLUDES DRYWALL FINISHING/TAPING$15.12$0.88$16.00
OPERATOR: LOADER$20.25$2.06$22.31
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$18.40$4.42$22.82
LABORER: PIPELAYER$16.19$2.15$18.34
LABORER: COMMON OR GENERAL, INCLUDING BRICK MASON TENDING AND CEMENT MASON TENDING$11.00$1.86$12.86
IRONWORKER, ORNAMENTAL$17.31$0.00$17.31
ELECTRICIAN$23.49$0.81$24.30
DRYWALL HANGER AND METAL STUD INSTALLER$17.27$0.62$17.89
DRYWALL FINISHER/TAPER$19.09$5.00$24.09
CEMENT MASON/CONCRETE FINISHER$18.92$0.00$18.92
CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION$21.00$3.11$24.11
BRICKLAYER, INCLUDES TILE SETTING AND FINISHING$26.20$7.43$33.63

Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.