Highway construction wages: Worcester, Massachusetts
Wage determination MA20260025 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MA20260025 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/MA20260025/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (INCLUDES FORM WORK) | $50.10 | $31.45 | $81.55 |
| ELECTRICIAN | $66.17 | $37.08 | $103.25 |
| POWER EQUIPMENT OPERATOR GROUP 2 BULLDOZER; GRADER/BLADE; ROLLER | $57.18 | $33.70 | $90.88 |
| POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; GRADALL; LOADER; PAVER (ASPHALT, AGGREGATE, AND CONCRETE); POST DRIVER (GUARDRAIL/FENCES) | $57.83 | $33.70 | $91.53 |
| POWER EQUIPMENT OPERATOR: MILLING MACHINE | $57.83 | $33.70 | $91.53 |
| IRONWORKER, STRUCTURAL | $57.57 | $37.67 | $95.24 |
| IRONWORKER: ORNAMENTAL | $57.57 | $37.67 | $95.24 |
| LABORER: COMMON OR GENERAL | $33.25 | $22.92 | $56.17 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $33.50 | $22.92 | $56.42 |
| LABORER (GUARDRAIL INSTALLATION) | $33.50 | $22.92 | $56.42 |
| PAINTER: STEEL | $56.76 | $36.00 | $92.76 |
| TRUCK DRIVER: FLATBED TRUCK | $48.53 | $0.00 | $48.53 |
| TRUCK DRIVER: DUMP TRUCK | $30.38 | $7.20 | $37.58 |
| TRUCK DRIVER: CONCRETE TRUCK | $33.69 | $15.79 | $49.48 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $44.49 | $12.41 | $56.90 |
| TRAFFIC CONTROL: FLAGGER | $23.00 | $20.44 | $43.44 |
| PILEDRIVERMAN | $45.65 | $23.33 | $68.98 |
| PAINTER: SPRAY (LINESTRIPING) | $48.00 | $0.00 | $48.00 |
| OPERATOR: PILEDRIVER | $44.46 | $16.94 | $61.40 |
| OPERATOR: MECHANIC | $48.14 | $17.02 | $65.16 |
| OPERATOR: FORKLIFT | $64.67 | $0.00 | $64.67 |
| OPERATOR: CRANE | $52.14 | $21.08 | $73.22 |
| LABORER: LANDSCAPE | $40.39 | $17.68 | $58.07 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $41.78 | $18.37 | $60.15 |
| IRONWORKER, REINFORCING | $56.48 | $20.62 | $77.10 |
| CEMENT MASON/CONCRETE FINISHER | $56.70 | $21.08 | $77.78 |