Highway construction wages: Plymouth, Massachusetts
Wage determination MA20260023 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MA20260023 on · latest revision 1 · verify at sam.gov/wage-determination/MA20260023/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (INCLUDES FORM WORK) | $50.10 | $31.45 | $81.55 |
| POWER EQUIPMENT OPERATOR GROUP 2 BULLDOZER; GRADER/BLADE; MILLING MACHINE; ROLLER | $57.18 | $33.70 | $90.88 |
| POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; LOADER; POST DRIVER (GUARDRAIL/FENCES) | $57.83 | $33.70 | $91.53 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | $57.87 | $37.67 | $95.54 |
| LABORER: CONCRETE SURFACER | $46.20 | $29.85 | $76.05 |
| LABORER LANDSCAPE | $38.95 | $29.41 | $68.36 |
| LABORER: FENCE ERECTION | $38.95 | $29.41 | $68.36 |
| LABORER: GUARDRAIL INSTALLATION | $38.95 | $29.81 | $68.76 |
| LABORER (COMMON OR GENERAL) | $33.25 | $22.92 | $56.17 |
| PAINTER: STEEL | $56.76 | $36.00 | $92.76 |
| TRUCK DRIVER: FLATBED TRUCK | $48.53 | $0.00 | $48.53 |
| TRUCK DRIVER: DUMP TRUCK | $37.35 | $11.00 | $48.35 |
| TRUCK DRIVER: CONCRETE TRUCK | $33.69 | $15.79 | $49.48 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $53.35 | $12.78 | $66.13 |
| TRAFFIC CONTROL: FLAGGER | $23.00 | $20.44 | $43.44 |
| PAINTER: SPRAY (LINESTRIPING) | $47.30 | $6.42 | $53.72 |
| OPERATOR: PILEDRIVER | $42.56 | $17.34 | $59.90 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $41.63 | $23.04 | $64.67 |
| OPERATOR: MECHANIC | $48.74 | $11.79 | $60.53 |
| OPERATOR: FORKLIFT | $64.67 | $0.00 | $64.67 |
| LABORER: JACK HAMMER | $38.69 | $17.33 | $56.02 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $44.43 | $14.18 | $58.61 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $34.32 | $17.35 | $51.67 |
| IRONWORKER, REINFORCING | $44.52 | $19.36 | $63.88 |
| ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION | $45.13 | $13.86 | $58.99 |
| CEMENT MASON/CONCRETE FINISHER | $56.70 | $21.08 | $77.78 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.