Highway construction wages: Hampden, Massachusetts
Wage determination MA20260019 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MA20260019 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/MA20260019/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR GROUP 2 MILLING MACHINE; PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $57.83 | $33.70 | $91.53 |
| POWER EQUIPMENT OPERATOR GROUP 2 BULLDOZER; GRADER/BLADE | $57.83 | $33.70 | $91.53 |
| POWER EQUIPMENT OPERATOR GROUP 1 BROOM/SWEEPER; CRANE; GRADALL; POST DRIVER (GUARDRAIL/FENCES) | $57.18 | $33.70 | $90.88 |
| POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; LOADER | $57.18 | $33.70 | $90.88 |
| POWER EQUIPMENT OPERATOR GROUP 4 ROLLER | $39.12 | $31.04 | $70.16 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | $41.89 | $33.90 | $75.79 |
| LABORER (TRAFFIC CONTROL: FLAGGER) | $35.00 | $26.91 | $61.91 |
| LABORER (COMMON OR GENERAL) | $35.00 | $26.91 | $61.91 |
| PAINTER: STEEL | $56.76 | $36.00 | $92.76 |
| TRUCK DRIVER: FLATBED TRUCK | $48.53 | $0.00 | $48.53 |
| TRUCK DRIVER: DUMP TRUCK | $43.81 | $5.39 | $49.20 |
| TRUCK DRIVER: CONCRETE TRUCK | $33.69 | $15.79 | $49.48 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $43.73 | $15.06 | $58.79 |
| PAINTER: SPRAY (LINESTRIPING) | $38.30 | $17.43 | $55.73 |
| OPERATOR: PILEDRIVER | $43.87 | $18.04 | $61.91 |
| OPERATOR: MECHANIC | $48.14 | $17.02 | $65.16 |
| OPERATOR: FORKLIFT | $51.63 | $0.00 | $51.63 |
| LABORER: LANDSCAPE | $44.11 | $18.85 | $62.96 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $44.43 | $14.18 | $58.61 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $33.10 | $18.09 | $51.19 |
| IRONWORKER, REINFORCING | $46.21 | $21.27 | $67.48 |
| ELECTRICIAN | $47.13 | $13.41 | $60.54 |
| CEMENT MASON/CONCRETE FINISHER | $52.13 | $20.89 | $73.02 |
| CARPENTER, INCLUDES FORM WORK | $33.03 | $20.02 | $53.05 |