Highway construction wages: Bristol, Massachusetts
Wage determination MA20260017 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MA20260017 on · latest revision 1 · verify at sam.gov/wage-determination/MA20260017/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION) | $66.17 | $37.08 | $103.25 |
| POWER EQUIPMENT OPERATOR GROUP 2 BULLDOZER; GRADER/BLADE; MILLING MACHINE; ROLLER | $57.18 | $33.70 | $90.88 |
| POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; LOADER; PAVER (ASPHALT, AGGREGATE, AND CONCRETE); POST DRIVER (GUARDRAIL/FENCES) | $57.83 | $33.70 | $91.53 |
| IRONWORKER: ORNAMENTAL | $57.57 | $37.67 | $95.24 |
| LABORER: CONCRETE SURFACER | $46.20 | $29.85 | $76.05 |
| LABORER: FENCE ERECTION | $38.95 | $29.41 | $68.36 |
| LABORER: COMMON OR GENERAL | $38.95 | $29.41 | $68.36 |
| LABORER: GUARDRAIL INSTALLATION | $38.95 | $29.81 | $68.76 |
| LABORER LANDSCAPE | $33.25 | $22.92 | $56.17 |
| PAINTER: STEEL | $56.76 | $36.00 | $92.76 |
| TRUCK DRIVER: FLATBED TRUCK | $48.53 | $0.00 | $48.53 |
| TRUCK DRIVER: DUMP TRUCK | $39.03 | $12.89 | $51.92 |
| TRUCK DRIVER: CONCRETE TRUCK | $33.69 | $15.79 | $49.48 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $53.35 | $12.78 | $66.13 |
| TRAFFIC CONTROL: FLAGGER | $23.00 | $20.44 | $43.44 |
| PAINTER: SPRAY (LINESTRIPING) | $47.30 | $6.42 | $53.72 |
| OPERATOR: PILEDRIVER | $42.56 | $17.34 | $59.90 |
| OPERATOR: MECHANIC | $48.74 | $11.79 | $60.53 |
| OPERATOR: FORKLIFT | $64.67 | $0.00 | $64.67 |
| LABORER: JACK HAMMER | $35.32 | $18.48 | $53.80 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $44.43 | $14.18 | $58.61 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $34.72 | $16.01 | $50.73 |
| IRONWORKER, STRUCTURAL | $45.19 | $17.30 | $62.49 |
| IRONWORKER, REINFORCING | $42.13 | $18.15 | $60.28 |
| CEMENT MASON/CONCRETE FINISHER | $56.70 | $21.08 | $77.78 |