Highway construction wages: Barnstable, Massachusetts
Wage determination MA20260015 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MA20260015 on · latest revision 1 · verify at sam.gov/wage-determination/MA20260015/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION) | $50.02 | $31.05 | $81.07 |
| POWER EQUIPMENT OPERATOR GROUP 2 BULLDOZER; GRADER/BLADE; MILLING MACHINE; ROLLER | $57.18 | $33.70 | $90.88 |
| POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; LOADER; PAVER (ASPHALT, AGGREGATE, AND CONCRETE); POST DRIVER (GUARDRAIL/FENCES) | $57.83 | $33.70 | $91.53 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | $57.87 | $37.67 | $95.54 |
| LABORER: CONCRETE SURFACER | $46.20 | $29.85 | $76.05 |
| LABORER: FENCE ERECTION | $38.95 | $29.41 | $68.36 |
| LABORER: COMMON OR GENERAL | $38.95 | $29.41 | $68.36 |
| LABORER LANDSCAPE | $38.95 | $29.41 | $68.36 |
| LABORER (GUARDRAIL INSTALLATION) | $35.00 | $26.91 | $61.91 |
| PAINTER: STEEL | $56.76 | $36.00 | $92.76 |
| TRUCK DRIVER: FLATBED TRUCK | $48.53 | $0.00 | $48.53 |
| TRUCK DRIVER: CONCRETE TRUCK | $33.69 | $15.79 | $49.48 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $53.35 | $12.78 | $66.13 |
| TRAFFIC CONTROL: FLAGGER | $23.00 | $20.44 | $43.44 |
| PAINTER: SPRAY (LINESTRIPING) | $47.30 | $6.42 | $53.72 |
| OPERATOR: PILEDRIVER | $42.56 | $17.34 | $59.90 |
| OPERATOR: MECHANIC | $48.74 | $11.79 | $60.53 |
| OPERATOR: FORKLIFT | $64.67 | $0.00 | $64.67 |
| LABORER: JACK HAMMER | $38.69 | $17.33 | $56.02 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $44.43 | $14.18 | $58.61 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $33.65 | $17.32 | $50.97 |
| IRONWORKER, REINFORCING | $44.52 | $19.36 | $63.88 |
| CEMENT MASON/CONCRETE FINISHER | $56.70 | $21.08 | $77.78 |
| CARPENTER, INCLUDES FORM WORK | $43.64 | $22.09 | $65.73 |
| TRUCK DRIVER: DUMP TRUCK | $40.78 | $37.35 | $78.13 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.