Residential construction wages: Franklin, Massachusetts
Wage determination MA20260011 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MA20260011 on · latest revision 1 · verify at sam.gov/wage-determination/MA20260011/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| INSULATOR/ASBESTOS WORKER (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) | $44.36 | $36.63 | $80.99 |
| BOILERMAKER | $50.62 | $28.82 | $79.44 |
| BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS (SPRINGFIELD CHAPTER) | $50.81 | $32.27 | $83.08 |
| CARPENTERS (FRANKLIN (ERVING, NORTH ORANGE, ORANGE, WARWICK)) | $43.33 | $27.82 | $71.15 |
| CARPENTER: ALL OTHER WORK (FRANKLIN (EXCEPT ERVING, ORANGE, NORTH ORANGE, WARWICK)) | $43.33 | $27.82 | $71.15 |
| CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT EXCEEDING 4 STORIES INCLUDING BASEMENT (WOOD FRAMING, SIDING AND EXTERIOR TRIM WORK) | $26.55 | $13.02 | $39.57 |
| CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT EXCEEDING 4 STORIES INCLUDING BASEMENT (ALL OTHER CARPENTRY WORK ON WOOD FRAME PROJECTS) | $26.55 | $13.02 | $39.57 |
| FLOOR LAYER: CARPET | $43.23 | $27.79 | $71.02 |
| ELECTRICIAN | $52.16 | $29.56 | $81.72 |
| ELEVATOR MECHANIC | $66.41 | $38.44 | $104.85 |
| POWER EQUIPMENT OPERATORS: GROUP 15 BOOM LENGTHS OVER 350 FEET INCLUDING JIB | $50.73 | $30.58 | $81.31 |
| POWER EQUIPMENT OPERATORS: GROUP 14 BOOM LENGTHS OVER 300 FEET INCLUDING JIB | $49.23 | $30.58 | $79.81 |
| POWER EQUIPMENT OPERATORS: GROUP 13 BOOM LENGTHS OVER 250 FEET INCLUDING JIB | $48.23 | $30.58 | $78.81 |
| POWER EQUIPMENT OPERATORS: GROUP 12 BOOM LENGTHS OVER 200 FEET INCLUDING JIB | $47.23 | $30.58 | $77.81 |
| POWER EQUIPMENT OPERATORS: GROUP 11 BOOM LENGTHS OVER 150 FEET INCLUDING JIB | $45.73 | $30.58 | $76.31 |
| POWER EQUIPMENT OPERATORS: GROUP 10 MASTER MECHANIC EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.73 | $30.58 | $75.31 |
| POWER EQUIPMENT OPERATORS: GROUP 9 OILER | $42.72 | $30.58 | $73.30 |
| POWER EQUIPMENT OPERATORS: GROUP 8 TRUCK CRANE CREWS | $42.41 | $30.58 | $72.99 |
| POWER EQUIPMENT OPERATORS: GROUP 7 COMPRESSORS UP TO 315 CU FT; SMALL MIXERS WITH SKIP; PUMPS UP TO 4 INCHES; POWER HEATERS; OILER; A-FRAME TRUCKS; FORKLIFTS-UP TO 7 FT. LIFT AND UP TO 3 TON CAPACITY; HYDRO BROOM; STUD WELDER | $52.73 | $30.58 | $83.31 |
| POWER EQUIPMENT OPERATORS: GROUP 6 COMPRESSOR (ONE OR TWO) 315 CU FT TO 900 CU FT; PUMPS 4 INCHES TO 16 INCHES (TOTAL DISCHARGE) | $34.41 | $30.58 | $64.99 |
| POWER EQUIPMENT OPERATORS: GROUP 5 HOISTS; CONVEYORS; POWER PAVEMENT BREAKERS; SELF-POWERED CONCRETE PAVEMENT FINISHING MACHINES; TWO BAG MIXERS WITH SKIP; MCCARTHY AND SIMILAR DRILLS; BATCH PLANTS (NOT SELF LOADING); BULK CEMENT PLANTS; SELF-PROPELLED MATERIAL SPREADERS; THREE OR MORE 10 KW LIGHT PLANTS; 30 KW OR MORE GENERATORS; POWER BROOM | $36.35 | $30.58 | $66.93 |
| POWER EQUIPMENT OPERATORS: GROUP 4 ASPHALT ROLLERS; SELF-POWERED ROLLERS AND COMPACTORS; TRACTOR WITHOUT BLADE DRAWING SHEEPSFOOT ROLLER; RUBBER TIRE ROLLER; VIBRATORY ROLLER OR OTHER TYPE OF COMPACTORS INCLUDING MACHINES FOR PULVERIZING AND AERATING SOIL; YORK RAKE | $37.47 | $30.58 | $68.05 |
| POWER EQUIPMENT OPERATORS: GROUP 3 COMBINATION BACKHOE/LOADER UP TO 3/4 CU YD; SCRAPERS UP TO 21 CU YD (STRUCK LOAD, SELF PROPELLED OR TRACTOR DRAWN); TIREMAN; FRONT END LOADERS UP TO 4 YDS; WELL DRILLERS; ENGINEER OR FIREMAN ON HIGH PRESSURE BOILER; SELF-LOADING BATCH PLANT; WELL POINT OPERATORS ELECTRIC PUMPS USED IN WELL POINT SYSTEM; PUMPS, 16 INCHES AND OVER (TOTAL DISCHARGE); COMPRESSOR, ONE OR TWO 900 CU FT AND OVER; POWERED GREASE TRUCK; TUNNEL LOCOMOTIVES AND DINGYS; GROUT PUMPS; HYDRAULIC JACKS; BOOM TRUCK; HYDRAULIC CRANES- UP TO 10 TON | $40.70 | $30.58 | $71.28 |
| POWER EQUIPMENT OPERATORS: GROUP 2 ROTARY DRILL WITH MOUNTED COMPRESSOR; COMPRESSOR HOUSE (3 TO 6 COMPRESSORS); ROCK AND EARTH BORING MACHINES (EXCLUDING MCCARTHY AND SIMILAR DRILLS); FRONT END LOADERS 4 CU YDS TO 5 1/2 CU YDS); FORKLIFTS-7 FT LIFT AND OVER 3 TON CAPACITY; SCRAPER 21 YDS AND OVER (STRUCK LOAD); SONIC HAMMER CONSOLE; RECLAIMERS ROAD PLANER/MILLING MACHINE; CAL TRACKS; BALLAST REGULATORS; RAIL ANCHOR MACHINES; SWITCH TAMPERS, ASPHALT PAVERS; MECHANIC; WELDER AND TRANSFER MACHINE | $40.92 | $30.58 | $71.50 |
| POWER EQUIPMENT OPERATORS: GROUP 1 SHOVELS; CRAWLERS AND TRUCK CRANES INCLUDING ALL TOWER; SELF-PROPELLED HYDRAULIC CRANES 10 TONS AND OVER; DRAGLINES; CLAM SHELLS; CABLEWAYS; SHAFT HOISTS; MUCKING MACHINES DERRICKS; BACKHOES; BULLDOZERS; GRADALLS; ELEVATING GRADERS; PILE DRIVERS; CONCRETE PAVERS; TRENCHING MACHINES; FRONT END LOADERS- 5 1/2 CU YDS AND OVER; DUAL DRUM PAVER; AUTOMATIC GRADER-EXCAVATOR(C.M.I. OR EQUAL); SCRAPERS TOWING PAN OR WAGON; TANDEM DOZERS OR PUSH CATS(2 UNITS IN TANDEM); SHOTCRETE MACHINE; TUNNEL BORING MACHINE; COMBINATION BACKHOE/LOADER 3/4 CU YD HOE OR OVER; JET ENGINE DRYER; TREE SHREDDER; POST HOLE DIGGER; POST HOLE HAMMER; POST EXTRACTOR; TRUCK MOUNTED CONCRETE PUMP WITH BOOM; ROTO-MILL; GRADER; HORIZONTAL DRILLING MACHINE; JOHN HENRY ROCK DRILL AND SIMILAR EQUIPMENT | $41.23 | $30.58 | $71.81 |
| IRONWORKER | $41.89 | $33.90 | $75.79 |
| LABORERS: GROUP 6 ASBESTOS ABATEMENT, TOXIC AND HAZARDOUS WASTE LABORERS (FRANKLIN (ORANGE, WARWICK)) | $38.95 | $29.70 | $68.65 |
| LABORERS: GROUP 5 FLAGGER (FRANKLIN (ORANGE, WARWICK)) | $38.95 | $29.70 | $68.65 |
| LABORERS: GROUP 4 BLASTER; POWDERMAN (FRANKLIN (ORANGE, WARWICK)) | $38.95 | $29.70 | $68.65 |
| LABORERS: GROUP 3 AIR TRACK OPERATOR; BLOCK PAVER; RAMMER; CURB SETTER;HYDRAULIC & SIMILAR SELF POWERED DRILLS (FRANKLIN (ORANGE, WARWICK)) | $38.95 | $29.70 | $68.65 |
| LABORERS: GROUP 2 ASPHALT RAKER; FENCE AND GUARD RAIL ERECTOR; LASER BEAM OPERATOR; MASON TENMDER; PIPELAYER; PNEUMATIC DRILL OPERATOR; PNEUMATIC TOOL OPERATOR; WAGON DRILL OPERATOR (FRANKLIN (ORANGE, WARWICK)) | $38.95 | $29.70 | $68.65 |
| LABORERS: GROUP 1 LABORERS; CARPENTER TENDERS; CEMENT FINISHER TENDERS (FRANKLIN (ORANGE, WARWICK)) | $38.95 | $29.70 | $68.65 |
| LABORERS: GROUP 5 POWDERMAN AND BLASTER (FRANKLIN (EXCEPT ORANGE, WARWICK)) | $33.50 | $26.02 | $59.52 |
| LABORERS: GROUP 4 AIR TRACK OPERATORS, BLOCK PAVERS, RAMMERS AND CURB SETTERS (FRANKLIN (EXCEPT ORANGE, WARWICK)) | $33.25 | $26.02 | $59.27 |
| LABORERS: GROUP 3 PRECAST FLOOR AND ROOF PLANK ERECTORS, SIGN ERECTORS, ASBESTOS REMOVAL LABORERS (FRANKLIN (EXCEPT ORANGE, WARWICK)) | $33.25 | $26.02 | $59.27 |
| LABORERS: GROUP 2 ASPHALT RAKERS, CARBIDE CORE DRILLER OPERATORS, CHAIN SAW OPERATORS, PIPELAYERS, JACKHAMMER AND PAVING BREAKER OPERATORS, BARCO TYPE JUMPING TAMPERS, LASER BEAM OPERATORS, CONCRETE PUMP OPERATORS, MASON TENDERS, MORTAR MIXERS, RIDE-ON MOTORIZED BUGGY OPERATORS, WAGON DRILL OPERATORS (FRANKLIN (EXCEPT ORANGE, WARWICK)) | $32.75 | $26.02 | $58.77 |
| LABORERS: GROUP 1 LABORERS, CARPENTER TENDERS, WRECKING LABORERS (FRANKLIN (EXCEPT ORANGE, WARWICK)) | $32.50 | $26.02 | $58.52 |
| LABORERS:, WRECKING: GROUP 6 ASBESTOS, LEAD PAINT, TOXIC AND HAZARDOUS WASTE | $46.25 | $29.70 | $75.95 |
| LABORERS:, WRECKING: GROUP 5 YARDMAN, BURNERS, SAWYERS | $45.35 | $29.70 | $75.05 |
| LABORERS:, WRECKING: GROUP 4 YARDMAN (SALVAGE YARD ONLY) | $42.25 | $29.70 | $71.95 |
| LABORERS:, WRECKING: GROUP 3 SMALL BACKHOES, LOADERS ON TRACKS, BOBCAT TYPE LOADERS, HYDRAULIC "BROCK" TYPE HAMMER OPERATORS, CONCRETE CUTTING SAWS | $47.25 | $29.70 | $76.95 |
| LABORERS:, WRECKING: GROUP 2 BURNERS, JACKHAMMERS | $47.00 | $29.70 | $76.70 |
| LABORERS:, WRECKING: GROUP 1 ADZEMAN, WRECKING LABORER | $46.25 | $29.70 | $75.95 |
| PAINTER: SPRAY, SANDBLAST | $39.48 | $31.85 | $71.33 |
| PAINTER: BRUSH, TAPER | $38.08 | $31.85 | $69.93 |
| PLUMBER AND STEAMFITTER (FRANKLIN (ORANGE)) | $55.00 | $31.57 | $86.57 |
| PLUMBER AND STEAMFITTER (FRANKLIN (EXCEPT MONROE, ROWE, AND THE WESTERN PART OF CHARLEMONT)) | $52.26 | $31.05 | $83.31 |
| PLUMBER AND STEAMFITTER (FRANKLIN (MONROE, ROWE, AND THE WESTERN PART OF CHARLEMONT)) | $52.26 | $31.05 | $83.31 |
| ROOFERS (PITCH, SLATE, TILE AND PRECAST CONCRETE) | $42.48 | $30.14 | $72.62 |
| ROOFERS (COMPOSITION ROOFERS & DAMP WATERPROOFERS) | $42.48 | $30.14 | $72.62 |
| SHEET METAL WORKER | $43.48 | $36.46 | $79.94 |
| TRUCK DRIVERS: GROUP 7 TRAILERS FOR EARTH MOVING EQUIPMENT (DOUBLE HOOKUP) POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM | $41.82 | $37.35 | $79.17 |
| TRUCK DRIVERS: GROUP 6 SPECIALIZED EARTH MOVING EQUIPMENT OVER 35 TONS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM | $41.53 | $37.35 | $78.88 |
| TRUCK DRIVERS: GROUP 5 SPECIALIZED EARTH MOVING EQUIPMENT UNDER 35 TONS OTHER THAN CONVENTIONAL TYPE TRUCKS; LOW BED; VACHUAL; MECHANICS, PAVING RESTORATION EQUIPMENT POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM | $41.24 | $37.35 | $78.59 |
| TRUCK DRIVERS: GROUP 4 FOUR AND FIVE AXLE EQUIPMENT (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM | $41.14 | $37.35 | $78.49 |
| TRUCK DRIVERS: GROUP 3 THREE AXLE EQUIPMENT AND TIREMAN POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM | $41.02 | $37.35 | $78.37 |
| TRUCK DRIVERS: GROUP 2 TWO AXLE EQUIPMENT; & FORKLIFT OPERATOR POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM | $40.95 | $37.35 | $78.30 |
| TRUCK DRIVERS: GROUP 1 STATION WAGONS; PANEL TRUCKS; AND PICKUP TRUCKS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM | $40.78 | $37.35 | $78.13 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.